BLD03-01067
| BLD-Aging Inspection | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | | CANC |
|
|
exp 11/5/03. 8/8/2003 3:25:23 PM
|
BLD02-02629
| BLD-Final | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 9:15:31 AM. Contact: ###-####. need special inspection for a-325 bolts need special inspection final letter, need x brace at line 5 , west end need accessable entrance to grade at one location of man doors. no temp oc left a c/n. 8/8/2003 11:33:52 AM
|
BLD03-01170
| BLD-Energy code compliance | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | FAIL |
|
|
LANCE; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell. fire block left c/n. 8/8/2003 3:13:34 PM
|
BLD03-01348
| BLD-Final | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PASS |
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
|
BLD02-02718
| BLD-Other | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:47:37 PM. Contact: ###-####.ok to drywall. 8/12/2003 10:27:04 AM
|
BLD02-02718
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:48:19 PM. Contact: ###-####.ok to drywall. 8/12/2003 10:24:16 AM
|
BLD02-01072
| BLD-Other | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:49:51 PM. Contact: ###-####.ok except 1 unit at south west side .will recall. 8/12/2003 10:25:10 AM
|
BLD02-01072
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:50:19 PM. Contact: ###-####.ok all except 1 unit will recall as joist needed repair. 8/12/2003 10:23:21 AM
|
BLD02-01067
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:52:21 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 8/7/2003 at 3:58:29 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 8/7/2003 at 3:55:31 PM. Contact: ###-####. 8/12/2003 10:21:53 AM needs addnl work shear. 8/12/2003 10:26:07 AM
|
BLD03-01677
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:54:08 PM. Contact: ###-####.needs addnl worl shear. 8/12/2003 10:26:29 AM
|
BLD02-02720
| BLD-Other | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:55:31 PM. Contact: ###-####.gyp crete areas of tubs etc. 8/12/2003 10:21:07 AMScheduled by a contractor via Hello! on 8/7/2003 at 3:55:31 PM. Contact: ###-####.gyp crete areas of tubs etc. 8/12/2003 10:21:21 AM
|
BLD02-01070
| BLD-Other | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:58:29 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 8/7/2003 at 3:55:31 PM. Contact: ###-####.gyp crete areas of tubs etc. 8/12/2003 10:21:07 AMScheduled by a contractor via Hello! on 8/7/2003 at 3:55:31 PM. Contact: ###-####.gyp crete areas of tubs etc. 8/12/2003 10:21:27 AM
|
BLD02-01066
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 4:00:09 PM. shear needs addnl work. 8/12/2003 10:27:46 AM
|
BLD03-01335
| BLD-Final | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 6:04:49 AM. needs fire life safety. before final can be called for. 8/8/2003 2:40:52 PM
|
BLD03-00482
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PASS |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD03-01794
| BLD-Foundation | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 3:20:49 PM. Contact: ###-####.
|
MEC03-02109
| Pressure Test | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | FAIL |
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. needs to bolted to the floor as per installation instructions. 8/8/2003 5:17:53 PM
|
MEC03-01540
| Final | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 9:28:46 AM. Contact: ###-####. Out of time Dixie left work,sbrian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. needs to bolted to the floor as per installation instructions.ent to me at 3:00pm. 8/8/2003 5:28:26 PM
|
MEC03-01541
| Final | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 9:29:11 AM. Contact: ###-####.Scheduled by a contractor via Hello! on 8/8/2003 at 9:28:46 AM. Contact: ###-####. Out of time Dixie left work, sent to mr at 3:00sbrian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. 8/8/2003 5:28:58 PM
|