Inspections for the day of: Friday, August 8, 2003.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01680 BLD-Final8/7/20038/8/20038/8/2003 12:00:00 AMAFAIL
TRAVIS; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
no inspection will be made untill Terry Records signs off on hillside ord. 8/8/2003 11:52:29 AM
BLD02-02382 BLD-Final8/7/20038/8/20038/8/2003 12:00:00 AMAPASS
KEVIN; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
c of c issued 8/8/2003 10:26:03 AM
BLD02-02383 BLD-Final8/7/20038/8/20038/8/2003 12:00:00 AMAPASS
KEVIN; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
c of c issued 8/8/2003 10:26:43 AM
BLD03-00591 BLD-Framing/Rough-in8/8/20038/8/20038/8/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 8/8/2003 at 6:44:03 AM. Contact: ###-####.
verbal corrections made ok,,, still need to see int shear 8/8/2003 12:37:12 PM
BLD03-01359 BLD-Framing/Rough-in8/7/20038/8/20038/8/2003 12:00:00 AMAPART
This is a sheer nailing inspection.
Thanks; Phone #: ###-#### Internet Inspection Request from: Josh Edwards
ext. shear ok 8/8/2003 11:39:49 AM
BLD03-00618 BLD-Wall cover8/7/20038/8/20038/8/2003 12:00:00 AMAPART
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
upper f/walls ok to stand 8/8/2003 10:35:48 AM
BLD03-00620 BLD-Wall cover8/7/20038/8/20038/8/2003 12:00:00 AMAPART
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
upper f/walls ok to stand 8/8/2003 10:35:30 AM
BLD03-01326 BLD-Footing8/7/20038/8/20038/8/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 8/7/2003 at 11:22:36 AM. Contact: ###-####.
retaining wall ftgs 8/8/2003 11:40:15 AM
MEC03-02119 Pressure Test8/7/20038/8/20038/8/2003 12:00:00 AMAPASS
###-#### grey
BLD03-01612 BLD-Energy code compliance8/7/20038/8/20038/8/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 8/7/2003 at 4:16:05 PM. Contact: ###-####.
MEC03-02035 Rough-in8/6/20038/8/20038/8/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 8/6/2003 at 10:56:00 AM. Contact: ###-####.
MEC03-02033 Rough-in8/6/20038/8/20038/8/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 8/6/2003 at 10:56:48 AM. Contact: ###-####.
BLD03-00008 BLD-Framing/Rough-in8/8/20038/8/20038/8/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 8/8/2003 at 8:58:22 AM. Contact: ###-####.
garage fix is ok pending eng. approval 8/8/2003 3:18:31 PM
BLD03-01290 BLD-Energy code compliance8/8/20038/8/20038/8/2003 12:00:00 AMPPASS
dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD03-01291 BLD-Energy code compliance8/8/20038/8/20038/8/2003 12:00:00 AMPPASS
dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MEC03-01992 Rough-in8/8/20038/8/20038/8/2003 12:00:00 AMPPART
Custom cabinets will be built around the fireplace, so it will not be framed completely. If you have any questions about the framing - call Greg ###-####.; Phone #: ###-#### Internet Inspection Request from: Lena Sloan
ok except for need to verify frame clearance at frame inspection 8/8/2003 3:20:29 PM
BLD03-01671 BLD-Footing8/8/20038/8/20038/8/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 8/8/2003 at 10:12:30 AM. Contact: ###-####.
BLD03-00117 BLD-Final8/8/20038/8/20038/8/2003 12:00:00 AMPPASS
mary ann; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok for perm occ. when trades are signed off,,, also if mech. permit was covered under elec. equipment all is ok for final. 8/8/2003 3:16:39 PM