Inspections for the day of: Friday, August 8, 2003.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC03-00334 Site Preparation8/6/20038/8/20038/8/2003 12:00:00 AMAPART
Inspected job site--water leaving site appears close to background--suggested to Sommer to position the 2 remaining straw wattles in ditch south of greenbelt. Left message for J. Conger (RP) to clean parkcenter with sweeper, protect d.i and maintain the one protected d.i (parkcenter) and to add drain rock to construction entrance. Discharge of water ok for now. 8/8/2003 2:00:30 PM
BLD03-01563 BLD-Footing8/7/20038/8/20038/8/2003 12:00:00 AMADONE
Scheduled by a contractor via Hello! on 8/7/2003 at 10:27:45 AM. Contact: ###-####. special inspection-- 8/7/2003 10:12:46 PM
ESC03-00609 Site Preparation8/8/20038/8/20038/8/2003 12:00:00 AMADONE
Reviewed plans and bmp's with p.d. (david bailey) and r.p (greg pulley -- american paving @ ###-####. Wire is needed per narrative behind installed silt fence. Should conditions warrent, additional bmp's to be installed prior to timeframe outline in narrative; i.e. mulch, tracking, silt fencing, straw bales, straw wattles, etc. Will follow up. 8/8/2003 10:26:44 AM
ESC03-00983 Site Preparation8/8/20038/8/20038/8/2003 12:00:00 AMADONE
Reviewed plans with Elliot S.--contractor on bmp's needed to construct the new driveway. Also talked to the realtor (Randy Worthington ###-####) who owns the land uphill from this property, informed him additional bmp's are needed to minize erosion and sediment controls--please install prior to next rain event. 8/8/2003 10:51:46 AM
ESC03-00691 Site Preparation8/8/20038/8/20038/8/2003 12:00:00 AMAFAIL
Trackout on 12th, fort and alley way--cleanup asap. will follow-up. 8/8/2003 11:11:03 AM