BLD05-01287
| FIRE-Final Inspection | 8/7/2006 | 8/8/2006 | 8/8/2006 4:06:19 PM | P | PASS |
|
|
Permit finaled
|
FIR06-00488
| INSP-Final Inspection | 8/8/2006 | 8/8/2006 | 8/8/2006 3:37:06 PM | P | PASS |
|
|
permit finaled
|
FIR05-00693
| INSP-Sprinkler Rough-in | 8/8/2006 | 8/8/2006 | 8/8/2006 3:24:55 PM | P | PASS |
|
|
See approved plans for locations ok to cover the sprinkler piping.
|
BLD06-01488
| FIRE-Final Inspection | 8/8/2006 | 8/8/2006 | 8/8/2006 3:01:49 PM | P | FAIL |
|
|
See the two page correction notice left on site for items needing correction.
|
BLD06-00061
| FIRE-Sprinkler Rough-in | 8/8/2006 | 8/8/2006 | 8/8/2006 3:00:01 PM | P | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR06-00254
| INSP-Final Inspection | 8/8/2006 | 8/8/2006 | 8/8/2006 2:53:20 PM | P | FAIL |
|
|
No test was performed since the sensors are not installed.
|
FIR06-00398
| INSP-Sprinkler Rough-in/Hydro | 8/4/2006 | 8/8/2006 | 8/8/2006 12:57:08 PM | A | PASS |
|
|
Rough-in passed. Still need to fire caulk penatrations at riser room, add earth quaking in dock area, finish inspectors test piping. No pressure testing or items usually associated with the final have been done yet.
|
FIR06-00469
| INSP-Sprinkler Rough-in | 8/7/2006 | 8/8/2006 | 8/8/2006 9:55:54 AM | A | PASS |
|
|
Sprinkler piping is ok to cover. As-builts need to be submitted prior to building final showing the piping changes on the first floor due to the beam and the added head in the restroom
|