Inspections for the day of: Tuesday, August 8, 2006.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-01287 FIRE-Final Inspection8/7/20068/8/20068/8/2006 4:06:19 PMPPASS
Permit finaled
FIR06-00488 INSP-Final Inspection8/8/20068/8/20068/8/2006 3:37:06 PMPPASS
permit finaled
FIR05-00693 INSP-Sprinkler Rough-in8/8/20068/8/20068/8/2006 3:24:55 PMPPASS
See approved plans for locations ok to cover the sprinkler piping.
BLD06-01488 FIRE-Final Inspection8/8/20068/8/20068/8/2006 3:01:49 PMPFAIL
See the two page correction notice left on site for items needing correction.
BLD06-00061 FIRE-Sprinkler Rough-in8/8/20068/8/20068/8/2006 3:00:01 PMPPASS
Sprinkler piping is ok to cover.
FIR06-00254 INSP-Final Inspection8/8/20068/8/20068/8/2006 2:53:20 PMPFAIL
No test was performed since the sensors are not installed.
FIR06-00398 INSP-Sprinkler Rough-in/Hydro8/4/20068/8/20068/8/2006 12:57:08 PMAPASS
Rough-in passed. Still need to fire caulk penatrations at riser room, add earth quaking in dock area, finish inspectors test piping. No pressure testing or items usually associated with the final have been done yet.
FIR06-00469 INSP-Sprinkler Rough-in8/7/20068/8/20068/8/2006 9:55:54 AMAPASS
Sprinkler piping is ok to cover. As-builts need to be submitted prior to building final showing the piping changes on the first floor due to the beam and the added head in the restroom