FIR07-00641
| INSP-Final Inspection | 8/7/2007 | 8/8/2007 | 8/8/2007 5:34:19 PM | P | PASS |
|
|
FA work passed inspection, one SD at the nac panel repaired while on site, permit finaled.
|
FIR07-00446
| INSP-Supply line flush | 8/8/2007 | 8/8/2007 | 8/8/2007 3:56:33 PM | P | PART |
|
|
UG supply line flush completed satisfactory.
|
FIR07-00599
| INSP-Conference | 8/7/2007 | 8/8/2007 | 8/8/2007 3:55:14 PM | A | DONE |
|
|
|
FIR07-00446
| INSP-Sprinkler Rough-in/Hydro | 8/8/2007 | 8/8/2007 | 8/8/2007 3:32:57 PM | P | PART |
|
|
UG hydrostatic test passed within allowable limits per NFPA 13.
|
BLD07-00917
| FIRE-Conference | 8/7/2007 | 8/8/2007 | 8/8/2007 3:13:10 PM | A | DONE |
|
|
On site visit to discuss fire code review notes and project related fire life safety issues including door hardware, exit signs/EM lighting, sprinkler coverage, fire alarm work, etc.
|
BLD07-01257
| FIRE-Final Inspection | 8/8/2007 | 8/8/2007 | 8/8/2007 1:40:57 PM | P | PASS |
|
|
Items on c/n are complete, life safety inspection passed.
|
BLD07-01364
| FIRE-Sprinkler Rough-in | 8/7/2007 | 8/8/2007 | 8/8/2007 1:01:06 PM | A | FAIL |
|
|
Inspection to be requested under the FIR permit for related work, noted two overspaced heads-locations indicated on approved plans.
|
BLD06-00205
| FIRE-Final Inspection | 8/8/2007 | 8/8/2007 | 8/8/2007 12:19:59 PM | A | PASS |
|
|
Final fire life safety inspection passed.
|
FIR07-00558
| INSP-Final Inspection | 8/6/2007 | 8/8/2007 | 8/8/2007 12:16:45 PM | A | PASS |
|
|
Fire alarm work passed field testing. Also discussed testing schedule for the 2nd floor FA modifications at the L&D rooms.
|
BLD06-00205
| FIRE-Alarm Testing | 8/7/2007 | 8/8/2007 | 8/8/2007 12:15:21 PM | A | PASS |
|
|
Inspection intended for fire life safety.
|
FIR07-00086
| INSP-Sprinkler Rough-in | 8/7/2007 | 8/8/2007 | 8/8/2007 12:09:58 PM | A | PART |
|
|
See approved plans for areas inspected and okayed for cover at the drop ceilings.
|
FIR07-00509
| INSP-Sprinkler Rough-in | 8/7/2007 | 8/8/2007 | 8/8/2007 12:08:56 PM | A | PART |
|
|
1st floor OH fire sprinkler system modifications are approved for cover, final pending ceiling tile and escutcheons.
|