BLD08-01270
| BLD-Framing/Rough-in | 8/5/2011 | 8/8/2011 | 8/9/2011 10:13:22 AM | A | PART |
|
|
dan Phone #: ###-####,, utility room ok to insulate
|
BLD11-01408
| BLD-Conference | 8/8/2011 | 8/8/2011 | 8/8/2011 4:58:51 PM | P | FAIL |
|
|
correction posted to get engineering on retaining wall area,, severe hillside issues,, caving in on forms,, need soils engineer report prior to pouring any concrete,, ok to do other work that is not of concern
|
BLD11-00416
| BLD-Framing/Rough-in | 8/5/2011 | 8/8/2011 | 8/8/2011 4:56:26 PM | P | PART |
|
|
framing, hold down & roofing//John Sanchez Phone #: ###-####,, roof nailing ok,, hold downs ok,, walk through with framer and super,, ok,, some verbal fixes,, mainly straps and fireblocks,, hidden straps ok to cover
|
BLD11-01350
| BLD-Footing | 8/5/2011 | 8/8/2011 | 8/8/2011 4:54:02 PM | P | NR |
|
|
bill Phone #: ###-####
|
BLD11-00477
| BLD-Framing/Rough-in | 8/8/2011 | 8/8/2011 | 8/8/2011 4:51:39 PM | P | PART |
|
|
Mike Phone #: ###-####,, frame ok,,, need another mech inspection,,, put a SWO on soffits,, they need 2 layers of 5/8",, (they were only putting 1 layer)
|
BLD11-01489
| BLD-Final | 8/5/2011 | 8/8/2011 | 8/8/2011 4:46:41 PM | P | DONE |
|
|
James Phone #: ###-####
|
BLD11-01489
| DOC - Permit Finaled | 8/8/2011 | 8/8/2011 | 8/8/2011 4:46:22 PM | P | PASS |
|
|
done
|
BLD11-01085
| BLD-Footing | 8/8/2011 | 8/8/2011 | 8/8/2011 4:45:09 PM | P | PART |
|
|
Bobby Phone #: ###-####,, basement interior footings,, work in progress,, ok
|
BLD11-01233
| BLD-Energy code compliance | 8/8/2011 | 8/8/2011 | 8/8/2011 4:40:20 PM | P | PASS |
|
|
Germain; Phone #: ###-####
|
BLD11-00439
| BLD-Framing/Rough-in | 8/5/2011 | 8/8/2011 | 8/8/2011 4:28:22 PM | P | PART |
|
|
layton Phone #: ###-####,, walls ok to cover
|
BLD11-01521
| BLD-Footing | 8/8/2011 | 8/8/2011 | 8/8/2011 4:06:41 PM | P | PART |
|
|
Tim-Footing/Foundation inspection Phone #: ###-####,, 2 exterior deck footings,, poured,,, walk through interior main level...
|
BLD11-00502
| BLD-Framing/Rough-in | 8/8/2011 | 8/8/2011 | 8/8/2011 3:27:30 PM | P | PART |
|
|
EXT #3 DAVID Please call at least 30 mins prior to inspection Phone #: ###-####,, need to strap plates,, new to existing,, fireblock ceiling lines,, ok to insulate
|
BLD11-01284
| BLD-Framing/Rough-in | 8/5/2011 | 8/8/2011 | 8/8/2011 12:16:03 PM | A | FAIL |
|
|
Micah Phone #: ###-####,, correction notice posted,, ok to insulate
|
BLD11-01242
| BLD-Other | 7/29/2011 | 8/8/2011 | 8/8/2011 12:00:00 AM | A | CANC |
|
|
Sheer Wall---Dave Phone####-####-contractor called and rescheduled
|