Inspections for the day of: Monday, August 8, 2011.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00352 General Inspection8/8/20118/8/20118/8/2011 3:33:15 PM PART
Areas not being worked that needs stabilization. All wood debris has been chipped and removed from site. Green up inside the park area continues.
ESC10-00918 General Inspection8/8/20118/8/20118/8/2011 3:25:18 PM PART
Structures completed, working on site stabilization. Bare ground has been installed with many l. feet of sediment barriers, (straw wattles). Some straw blankets installed, rp could not tell me if seeding had taken place prior to seeding or not. Options discussed and basic information regarding proper re-stabilization took place. I informed RP that Boise City needs re-vegetation (at least 70%) to completed the terms of the ESC permit.
ESC10-00750 Site Preparation8/8/20118/8/20118/8/2011 2:41:30 PMPPART
Verbal to RP, replace drop inlet protection from filter fabric to appr. products, e.x.Brooksome, Ultra Drain, (witched hats). As well, post sign where visuable to the general public. Completd by end of the week.
ESC11-00550 Site Preparation8/8/20118/8/20118/8/2011 2:02:18 PM NR