FIR11-00299
| INSP-Sprinkler Rough-in/Hydro | 8/8/2011 | 8/8/2011 | 8/8/2011 3:57:12 PM | P | PASS |
|
|
The underground hydro test passed.
|
FIR11-00302
| INSP-Final Inspection | 8/8/2011 | 8/8/2011 | 8/8/2011 3:56:02 PM | P | FAIL |
|
|
See the city approved plans for redline corrections. No devices have been tested except for main level audibility which was ok.
|
FIR11-00289
| INSP-Final Inspection | 8/8/2011 | 8/8/2011 | 8/8/2011 3:54:18 PM | P | PASS |
|
|
Permit finaled
|
FIR11-00370
| INSP-Sprinkler Rough-in | 8/5/2011 | 8/8/2011 | 8/8/2011 3:52:31 PM | P | PART |
|
|
Sprinkler piping rough-in passed except the branchline restraints are missing. A separate inspection will be required for the drops/armovers when they are complete.
|
BLD11-01801
| FIRE-Final Inspection | 8/8/2011 | 8/8/2011 | 8/8/2011 3:24:28 PM | P | FAIL |
|
|
Provide approved hardware on the exit door and provide the ailse widths per the approved plans.
|
BLD11-00028
| FIRE-Final Inspection | 8/5/2011 | 8/8/2011 | 8/8/2011 1:18:05 PM | A | FAIL |
|
|
Provide an additional fire extinguisher and provide the building address.
|
FIR11-00285
| INSP-Sprinkler Rough-in/Hydro | 8/5/2011 | 8/8/2011 | 8/8/2011 11:51:55 AM | A | PASS |
|
|
The underground supply piping hydro test passed.
|
BLD11-01683
| FIRE-Conference | 8/4/2011 | 8/8/2011 | 8/8/2011 10:21:12 AM | A | DONE |
|
|
Bill and I went over required life safety requirements including the new second exit at the restroom location.
|
BLD11-01817
| FIRE-Final Inspection | 8/5/2011 | 8/8/2011 | 8/8/2011 9:33:47 AM | A | PASS |
|
|
life safety passed
|
BLD11-00686
| FIRE-Final Inspection | 8/8/2011 | 8/8/2011 | 8/8/2011 8:10:41 AM | A | PASS |
|
|
life safety passed
|