Inspections for the day of: Monday, August 8, 2011.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00299 INSP-Sprinkler Rough-in/Hydro8/8/20118/8/20118/8/2011 3:57:12 PMPPASS
The underground hydro test passed.
FIR11-00302 INSP-Final Inspection8/8/20118/8/20118/8/2011 3:56:02 PMPFAIL
See the city approved plans for redline corrections. No devices have been tested except for main level audibility which was ok.
FIR11-00289 INSP-Final Inspection8/8/20118/8/20118/8/2011 3:54:18 PMPPASS
Permit finaled
FIR11-00370 INSP-Sprinkler Rough-in8/5/20118/8/20118/8/2011 3:52:31 PMPPART
Sprinkler piping rough-in passed except the branchline restraints are missing. A separate inspection will be required for the drops/armovers when they are complete.
BLD11-01801 FIRE-Final Inspection8/8/20118/8/20118/8/2011 3:24:28 PMPFAIL
Provide approved hardware on the exit door and provide the ailse widths per the approved plans.
BLD11-00028 FIRE-Final Inspection8/5/20118/8/20118/8/2011 1:18:05 PMAFAIL
Provide an additional fire extinguisher and provide the building address.
FIR11-00285 INSP-Sprinkler Rough-in/Hydro8/5/20118/8/20118/8/2011 11:51:55 AMAPASS
The underground supply piping hydro test passed.
BLD11-01683 FIRE-Conference8/4/20118/8/20118/8/2011 10:21:12 AMADONE
Bill and I went over required life safety requirements including the new second exit at the restroom location.
BLD11-01817 FIRE-Final Inspection8/5/20118/8/20118/8/2011 9:33:47 AMAPASS
life safety passed
BLD11-00686 FIRE-Final Inspection8/8/20118/8/20118/8/2011 8:10:41 AMAPASS
life safety passed