FIR11-00492
| INSP-Final Inspection | 8/7/2012 | 8/8/2012 | 8/10/2012 9:08:49 AM | P | PASS |
|
|
Permit finaled
|
FIR09-00263
| FIR-Aging Inspection | 8/8/2012 | 8/8/2012 | 8/9/2012 9:46:12 AM | | DONE |
|
|
permit needs to be voided by contractor
|
FIR12-00347
| INSP-Sprinkler Rough-in/Hydro | 8/8/2012 | 8/8/2012 | 8/8/2012 4:01:29 PM | P | PART |
|
|
Underground hydro test passed.
|
FIR12-00409
| INSP-Sprinkler Rough-in | 8/7/2012 | 8/8/2012 | 8/8/2012 2:10:29 PM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
|
BLD12-01227
| FIRE-Final Inspection | 8/7/2012 | 8/8/2012 | 8/8/2012 11:09:15 AM | A | PASS |
|
|
life safety passed. Smoke detector in the closet is not required as per plan review research.
|
BLD12-01136
| FIRE-Final Inspection | 8/7/2012 | 8/8/2012 | 8/8/2012 8:41:17 AM | A | PASS |
|
|
Life safety passed
|
FIR12-00424
| INSP-Final Inspection | 8/7/2012 | 8/8/2012 | 8/8/2012 8:40:07 AM | A | PASS |
|
|
Permit finaled
|
BLD12-00451
| FIRE-Final Inspection | 8/7/2012 | 8/8/2012 | 8/8/2012 8:39:40 AM | A | PASS |
|
|
Life safety passed. The door to the donations area is to have the thumbturn removed prior to building inspection
|