FIR13-00335
| INSP-Final Inspection | 8/7/2013 | 8/8/2013 | 8/9/2013 3:06:08 PM | A | PASS |
|
|
Scope of fire alarm work passed functional testing. Permit finaled.
|
FIR13-00334
| INSP-Final Inspection | 8/7/2013 | 8/8/2013 | 8/9/2013 8:16:28 AM | P | NR |
|
|
Not ready for final per contractor
|
BLD13-01920
| FIRE-Conference | 8/8/2013 | 8/8/2013 | 8/9/2013 8:15:39 AM | P | DONE |
|
|
On site conference regarding modifications needed to the fire alarm system due to tenant remodel work. Also discussed life safety conditions, fire sprinkler coverage, etc.
|
BLD13-01451
| FIRE-Final Inspection | 8/7/2013 | 8/8/2013 | 8/8/2013 12:12:37 PM | A | PASS |
|
|
Correction items verified for completion. Life safety finaled.
|
BLD13-01629
| FIRE-Final Inspection | 8/7/2013 | 8/8/2013 | 8/8/2013 9:45:31 AM | A | PASS |
|
|
Fire life safety inspection passed.
|
BLD13-01540
| BLD-Final | 8/7/2013 | 8/8/2013 | 8/8/2013 9:43:45 AM | A | PASS |
|
|
Fire life safety finaled.
|