FIR13-00263
| INSP-Sprinkler Rough-in | 8/7/2013 | 8/8/2013 | 8/8/2013 4:13:20 PM | P | PASS |
|
|
Building 12 underground supply piping is ok to cover with the understanding that the plans will need to be resubmitted to show the connection and routing changes.
|
FIR13-00344
| INSP-Sprinkler Rough-in | 8/7/2013 | 8/8/2013 | 8/8/2013 4:09:04 PM | P | PASS |
|
|
The 2" poly supply piping is ok to cover
|
FIR13-00037
| INSP-Sprinkler Rough-in | 8/7/2013 | 8/8/2013 | 8/8/2013 1:35:10 PM | P | PASS |
|
|
Rough to cover on first and second floors. See the city approved plans for areas marked "ok" in red. I noted one electrical room missing an upright sprinkler head.
|
BLD13-01224
| FIRE-Final Inspection | 8/7/2013 | 8/8/2013 | 8/8/2013 12:55:20 PM | P | PART |
|
|
Life safety in Class Room B is passed and is ok to occupy.. Fire alarm plans have been submitted.
|
BLD13-01952
| FIRE-Final Inspection | 8/7/2013 | 8/8/2013 | 8/8/2013 11:59:46 AM | A | FAIL |
|
|
Started the inspection ans explained to Karrie that I needed to verify that all exit signs and emergency lighting functioned and were in place as required per the approved plans. We agreed to reschedule for when SimplexGrinnell could be there to test these items for me. karrie Phone #: ###-####
|
BLD13-02107
| FIRE-Final Inspection | 8/7/2013 | 8/8/2013 | 8/8/2013 11:11:37 AM | A | PASS |
|
|
life safety passed
|
FIR13-00275
| INSP-Alarm Testing | 8/8/2013 | 8/8/2013 | 8/8/2013 10:53:00 AM | A | DONE |
|
|
See the city approved plans for the phase 1 and phase 2 areas tested today.. Door hold opens will need to be tested when installed.
|
FIR12-00177
| INSP-Alarm Testing | 8/6/2013 | 8/8/2013 | 8/8/2013 9:16:04 AM | A | FAIL |
|
|
Inspection was for an elevator test but I could not perform the test since the monitoring was not set up yet. I then did a walk through of the first and second floors to verify a/v spacing. I found many a/v's are overspaced most of which were in the restrooms. Many a/v's are missing/have not been installed. The multiple rooms in the Kitchen Area are not built yet and notification has not been installed. The Copy Room has been changed into an office and the a/v deleted. Most of the 15cd a/v in the corridors are mounted above 10' which is too high. Per the installed 12 in-duct detectors have been added. The main elevator, per the contractor, is being "grand fathered" by the state of Idaho and will not be required to have recall as shown on the plans. I did not inspect the basement. Plan modifications are required prior to additional inspections and final sign off.
|
FIR13-00276
| INSP-Final Inspection | 8/7/2013 | 8/8/2013 | 8/8/2013 9:03:44 AM | A | PASS |
|
|
permit finaled
|