BLD13-03540
| BLD-Wall Bracing | 8/8/2014 | 8/8/2014 | 8/8/2014 4:09:02 PM | P | PASS |
|
|
2nd floor shear. Please inspect between 10 and 11 am. Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03547
| BLD-Conference | 8/8/2014 | 8/8/2014 | 8/8/2014 4:08:14 PM | P | PASS |
|
|
2nd floor shear. Please inspect between 10 and 11 am. Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03545
| BLD-Wall Bracing | 8/8/2014 | 8/8/2014 | 8/8/2014 4:07:57 PM | P | PASS |
|
|
2nd floor shear. Please inspect between 10 and 11 am. Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03546
| BLD-Wall Bracing | 8/8/2014 | 8/8/2014 | 8/8/2014 4:04:25 PM | P | PASS |
|
|
2nd floor shear. Please inspect between 10 and 11 am. Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03537
| BLD-Framing/Rough-in | 8/8/2014 | 8/8/2014 | 8/8/2014 3:33:32 PM | P | PASS |
|
|
|
BLD13-03553
| BLD-Wall cover | 8/8/2014 | 8/8/2014 | 8/8/2014 3:33:06 PM | P | PASS |
|
|
firewall Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03552
| BLD-Wall cover | 8/8/2014 | 8/8/2014 | 8/8/2014 3:32:43 PM | P | PASS |
|
|
firewall Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03551
| BLD-Wall cover | 8/8/2014 | 8/8/2014 | 8/8/2014 3:32:21 PM | P | PASS |
|
|
firewall Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03550
| BLD-Wall cover | 8/8/2014 | 8/8/2014 | 8/8/2014 3:32:04 PM | P | PASS |
|
|
firewall Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD14-01713
| BLD-Framing/Rough-in | 8/6/2014 | 8/8/2014 | 8/8/2014 3:24:30 PM | P | CANC |
|
|
Phone #: 2088699235 >> Inspection requested via mobile web by Chris Downey
|
ESC14-00408
| Site Preparation | 8/8/2014 | 8/8/2014 | 8/8/2014 2:50:38 PM | P | CANC |
|
|
|
ESC14-00408
| Random Inspection | 8/8/2014 | 8/8/2014 | 8/8/2014 2:50:29 PM | P | PART |
|
|
Needs to sweep silts from strret, empty concrete washout. Correction notice to RP.
|
BLD14-01103
| BLD-Foundation | 8/8/2014 | 8/8/2014 | 8/8/2014 2:48:29 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD14-01105
| BLD-Foundation | 8/8/2014 | 8/8/2014 | 8/8/2014 2:48:12 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD14-01237
| BLD-Energy code compliance | 8/8/2014 | 8/8/2014 | 8/8/2014 2:41:01 PM | P | PASS |
|
|
Pat Phone #: ###-####
|
GCB14-00038
| GCB-Framing | 8/8/2014 | 8/8/2014 | 8/8/2014 1:39:21 PM | P | PASS |
|
|
mike brown ###-#### plans on side of furnace
|
GCB14-00038
| GCB-Energy | 8/8/2014 | 8/8/2014 | 8/8/2014 1:39:19 PM | P | PASS |
|
|
mike brown ###-#### plans on side of furnace
|
BLD13-01688
| BLD-Framing/Rough-in | 8/7/2014 | 8/8/2014 | 8/8/2014 11:11:57 AM | A | PASS |
|
|
Charles Phone #: ###-####. Interior steel stud framed walls at phase 2 of lobby remodel, work room C110 and reception C117.
|
BLD13-01688
| BLD-Ceiling Grid Inspection | 8/7/2014 | 8/8/2014 | 8/8/2014 11:09:57 AM | A | PART |
|
|
Charles Phone #: ###-####. ceiling grid ok in general storage room B165. Didnote some penetrations not yet fire caulked. Will reinspect on monday.
|
BLD13-03545
| BLD-Wall Bracing | 8/7/2014 | 8/8/2014 | 8/8/2014 10:26:41 AM | A | NR |
|
|
2nd floor shear Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03546
| BLD-Wall Bracing | 8/7/2014 | 8/8/2014 | 8/8/2014 10:26:25 AM | A | NR |
|
|
2nd floor shear. Please inspect between 10 and 11 am. Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03547
| BLD-Wall Bracing | 8/7/2014 | 8/8/2014 | 8/8/2014 10:26:11 AM | A | NR |
|
|
2nd floor shear Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03540
| BLD-Wall Bracing | 8/7/2014 | 8/8/2014 | 8/8/2014 10:25:56 AM | A | NR |
|
|
2nd floor shear Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03537
| BLD-Framing/Rough-in | 8/7/2014 | 8/8/2014 | 8/8/2014 10:19:00 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark. Needs to complete airseal pack.
|
BLD14-01561
| BLD-Other | 8/7/2014 | 8/8/2014 | 8/8/2014 9:45:59 AM | A | DONE |
|
|
Roger-re inspections for the exterior stairway Phone #: ###-####. frost protection for post completed.
|
BLD14-01713
| BLD-Framing/Rough-in | 8/5/2014 | 8/8/2014 | 8/8/2014 9:38:11 AM | A | PART |
|
|
Phone #: 2088699235 >> Inspection requested via mobile web by Chris Downey. Interior steel stud framed walls only. No grid. pending electrical rough in inspection. Also noted the owner wants to split off the office portion for a state farm office, which would need a seperate permit. Contractor noted that the owner has been in contact with the city to work through the issues. Contacted plan reviewer, waiting for call back, to see if they are aware of the issues.
|
BLD14-00206
| BLD-Wall Bracing | 8/7/2014 | 8/8/2014 | 8/8/2014 9:17:27 AM | A | PASS |
|
|
Richard Phone #: ###-####. roof straping ok.
|
BLD14-00205
| BLD-Wall Bracing | 8/7/2014 | 8/8/2014 | 8/8/2014 9:16:58 AM | A | PASS |
|
|
Richard Phone #: ###-####. Roof strapping ok.
|
BLD14-00457
| BLD-Framing/Rough-in | 8/7/2014 | 8/8/2014 | 8/8/2014 9:12:06 AM | A | PASS |
|
|
Brian Phone #: ###-####. phase 2 framing ok.
|
BLD14-01237
| BLD-Energy code compliance | 8/7/2014 | 8/8/2014 | 8/8/2014 9:11:30 AM | A | CANC |
|
|
Pat Phone #: ###-####. cancelled per phone call from contractor.
|