Inspections for the day of: Monday, August 8, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE12-02164 ELE-Aging Inspection8/8/20168/8/20168/10/2016 4:20:52 PM PASS
Waiting on contractor
ELE15-02740 Conference8/8/20168/8/20168/8/2016 4:43:10 PMPDONE
Seth Phone #: ###-####
Discussed pool final needed. Checked history because another inspector started job and I took over 1/2 way through. Notes exist for all inspections needed for pool, shell, perimeter bond, all metallic rails and ladders, Final has not been done yet. Reliant Electric responsible party on all associated wiring for pool. A seperate BLD permit exists for pool. BLD15-02068. Contractor to call to correct issue and will provide permit for pool
ELE16-01946 Electrical Rough-In8/5/20168/8/20168/8/2016 3:05:17 PMPPASS
4th Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Discussed with Electrical and Plumbing foreman the required work space to control junction box of HVAC unit in ceiling areas. As per Daryl DeGrange must have at least 18" depth access to these areas.
Level 4 wall rough in ok cover
ELE15-00495 Electrical Rough-In8/8/20168/8/20168/8/2016 2:11:53 PMPPASS
Wall rough in for cover remaining walls in Stair 4 in GBAD
Canopy light rough in on South and North side of GBAD first level exterior.
Contact is Eric Gibson ###-####3. Phone #: ###-#### Inspection requested via web by Toby Groves
D-6 elevator lobby and out soffit, East alley lid, stair 4 levels 1 and 2 wall rough in ok cover
ELE14-01611 Electrical Rough-In8/8/20168/8/20168/8/2016 1:31:40 PMPPASS
kitchen area. Please call Dave 30 min before ###-#### Phone #: ###-#### Inspection requested via web by danny perrine
Kitche remodel rough in ok cover
ELE16-02487 Final8/5/20168/8/20168/8/2016 10:04:46 AMAPASS
Phone #: ###-#### Inspection requested via web by Craig Korell Final ok
ESC15-01439 Random Inspection8/8/20168/8/20168/8/2016 9:55:34 AMPPASS
Lot clean, landscaping almost complete
ESC15-01463 Random Inspection8/8/20168/8/20168/8/2016 9:53:59 AMPPASS
All trash conained to lot
ESC15-01432 Random Inspection8/8/20168/8/20168/8/2016 9:52:29 AMPPASS
Lot clean, landscaping alost complete.
ESC15-01440 Random Inspection8/8/20168/8/20168/8/2016 9:48:24 AMPPASS
Landscaping almost complete. All contained to lot.
ELE16-02510 Electrical Rough-In8/5/20168/8/20168/8/2016 9:30:55 AMAPASS
Phone #: ###-#### Inspection requested via web by JENNY EMEL
Wall rough in ok cover
ELE16-02561 Final8/7/20168/8/20168/8/2016 8:56:39 AMAPASS
Please call me when youare on your way it is on the roof and I have to get the key out of the lock box to get us up there. Thank you Phone #: ###-#### Inspection requested via web by Jay Symonds
Final ok
ELE16-02561 Electrical Rough-In8/8/20168/8/20168/8/2016 8:56:21 AMPPASS
Please call me when youare on your way it is on the roof and I have to get the key out of the lock box to get us up there. Thank you Phone #: ###-#### Inspection requested via web by Jay Symonds

Contractor to safe off exposed wiring. Rough in ok
ELE16-02557 Electrical Rough-In8/5/20168/8/20168/5/2016 1:17:27 PMACANC
Randy. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Inspection cancelled from web by: Sean DeLacy