BLD16-02589
| BLD-Footing | 8/8/2016 | 8/8/2016 | 8/8/2016 4:28:43 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
BLD16-02021
| BLD-Energy code compliance | 8/8/2016 | 8/8/2016 | 8/8/2016 4:06:47 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
BLD16-00686
| BLD-Conference | 8/5/2016 | 8/8/2016 | 8/8/2016 4:06:34 PM | A | PEND |
|
|
Call prior to going Phone #: 2089949691 >> Inspection requested via mobile web by Marty Pieroni ,, pending engineer report
|
BLD16-02572
| BLD-Foundation | 8/5/2016 | 8/8/2016 | 8/8/2016 3:36:38 PM | P | PART |
|
|
Wall // mana Phone #: ###-####,, monolithic pour
|
BLD16-01511
| BLD-Framing/Rough-in | 8/8/2016 | 8/8/2016 | 8/8/2016 2:53:28 PM | P | NR |
|
|
David Phone #: ###-####,, need trades
|
BLD16-00893
| BLD-Final | 8/8/2016 | 8/8/2016 | 8/8/2016 2:52:59 PM | P | NR |
|
|
Justin Phone #: ###-####,, needs zoning, electrical 1st,, no inspection done
|
BLD15-02740
| BLD-Final | 8/8/2016 | 8/8/2016 | 8/8/2016 2:51:57 PM | P | CANC |
|
|
Seth Phone #: ###-####,, wrong permit # called in
|
BLD15-04063
| BLD-Framing/Rough-in | 8/5/2016 | 8/8/2016 | 8/8/2016 2:43:03 PM | P | PART |
|
|
Kent Phone #: ###-####,, 1st floor exterior walls ok to insulate from ceiling down 3 ft,, also 2nd and 3rd floor corridor ceilings ok after verification of hanger toe nail size
|
MIS16-00239
| BLD-Conference | 8/5/2016 | 8/8/2016 | 8/8/2016 1:58:47 PM | A | PEND |
|
|
possible interior work being done without a permit,, status review
|
BLD16-01223
| BLD-Wall Bracing | 8/5/2016 | 8/8/2016 | 8/8/2016 1:57:29 PM | A | CANC |
|
|
Charlie Phone #: ###-####
|
BLD16-02180
| BLD-Other | 8/7/2016 | 8/8/2016 | 8/8/2016 1:17:38 PM | A | PASS |
|
|
Basement concrete rebar inspection Phone #: ###-#### Inspection requested via web by Eric White,, IFC block ok
|
BLD16-02620
| BLD-Foundation | 8/8/2016 | 8/8/2016 | 8/8/2016 12:00:00 AM | P | CANC |
|
|
Jim Phone #: ###-####
|