PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, August 8, 2017
.
Number of inspections:
38
Percentage of inspections complete:
97 %
Percentage of inspections not complete:
3 %
Contact Information
Inspector
Mike Jordan
Title
BLD-COM/RES INSPECTOR
Phone #
794-9473
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
MIS17-00248
BLD-Conference
8/4/2017
8/4/2017
P
BLD12-01277
BLD-Framing/Rough-in
8/7/2017
8/8/2017
8/8/2017 4:30:38 PM
A
PART
Barbara (alt. number Luke ###-####) Phone #: ###-####. Walk through only. Building has been framed and sided. No wall bracing inspection has been done. Noted that all blocking on the interior appeared to be installed. Portions of the addition are being used by the homeowner. Some plumbing has been completed and a laundry room and partial bathroom are being used. I noted to the homeowner that electrical, plumbing and mec. permits are required, get those permits have have the inspectors out to inspect work done this far. It appears that some electrical work has been completed. Homeowner using extension chords at this time for power. I contacted Daryl Degrange and Bill Vandegrift and made them aware of the situation. Home owner wants to complete work and sell house in one year. Will reschedule a building conferance in one month to check on progress.
BLD16-01757
BLD-Framing/Rough-in
8/8/2017
8/8/2017
8/8/2017 4:24:35 PM
P
PASS
Steve Phone #: ###-####. Ok to sheetrock corridor ceilings in bldg. 100. only.
BLD16-03176
BLD-Final
8/7/2017
8/8/2017
8/8/2017 3:08:29 PM
P
PASS
Matt Phone #: ###-####. Ok for perm occ. No electrical permit was required.
BLD17-00359
BLD-Concrete
8/7/2017
8/8/2017
8/8/2017 2:39:36 PM
P
PASS
rebar- Jeff Phone #: ###-####. Stemwalls on grid NM from grids N2-N4. Interior column pad footings on grid N4 at grids NG, NF and NC.
ESC16-01037
Site Preparation
8/8/2017
8/8/2017
8/8/2017 2:10:08 PM
P
PASS
BLD16-02752
BLD-Foundation
8/7/2017
8/8/2017
8/8/2017 2:09:58 PM
P
PASS
Dane Phone #: ###-####
BLD16-02755
BLD-Foundation
8/7/2017
8/8/2017
8/8/2017 2:09:46 PM
P
PASS
Dane Phone #: ###-####
ESC16-01039
Site Preparation
8/8/2017
8/8/2017
8/8/2017 2:09:34 PM
P
PASS
ESC16-01040
Site Preparation
8/8/2017
8/8/2017
8/8/2017 2:09:20 PM
P
PASS
BLD16-02756
BLD-Foundation
8/7/2017
8/8/2017
8/8/2017 2:09:08 PM
P
PASS
Dane Phone #: ###-####
BLD16-02757
BLD-Footing
8/8/2017
8/8/2017
8/8/2017 2:08:57 PM
P
PASS
ESC16-01036
Site Preparation
8/8/2017
8/8/2017
8/8/2017 2:08:44 PM
P
PASS
ESC16-01038
Site Preparation
8/8/2017
8/8/2017
8/8/2017 2:08:33 PM
P
PASS
BLD16-02753
BLD-Foundation
8/7/2017
8/8/2017
8/8/2017 2:08:21 PM
P
PASS
Dane Phone #: ###-####
ESC17-00784
Site Preparation
8/8/2017
8/8/2017
8/8/2017 1:20:24 PM
P
PASS
BLD17-02085
BLD-Footing
8/7/2017
8/8/2017
8/8/2017 1:20:07 PM
P
PASS
Jerry Phone #: ###-####
MIS17-00238
BLD-Conference
8/1/2017
8/8/2017
8/8/2017 10:23:21 AM
A
PASS
check on status...
MIS17-00238
DOC - Permit Finaled
8/8/2017
8/8/2017
8/8/2017 10:23:11 AM
P
PASS
A building permit has been issued. This is the incorrect addres. The correct address is 1309 N. Patricia.
BLD17-02526
BLD-Final
8/7/2017
8/8/2017
8/8/2017 10:13:37 AM
A
PART
Phone #: ###-#### Inspection requested via web by Todd Kurns. Ok for temp occ. waiting on door hardware that has been ordered and i about a week out.
BLD17-02648
BLD-Final
8/7/2017
8/8/2017
8/8/2017 10:12:29 AM
A
PASS
Phone #: ###-#### Inspection requested via web by Todd Kurns
BLD17-02648
DOC - Permit Finaled
8/8/2017
8/8/2017
8/8/2017 10:12:22 AM
P
PASS
BLD17-01825
BLD-Final
8/7/2017
8/8/2017
8/8/2017 9:49:38 AM
A
PASS
If possible, please do the inspection between 8:30 and 10am as the homeowner will be gone after that Phone #: ###-#### Inspection requested via web by Christian Kilpatrick
BLD17-01825
DOC - Permit Finaled
8/8/2017
8/8/2017
8/8/2017 9:49:28 AM
P
PASS
BLD17-01815
BLD-Wall cover
8/7/2017
8/8/2017
8/8/2017 9:35:28 AM
A
PASS
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD17-01815
BLD-Energy code compliance
8/7/2017
8/8/2017
8/8/2017 9:35:16 AM
A
PASS
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD17-01815
BLD-Framing/Rough-in
8/8/2017
8/8/2017
8/8/2017 9:35:07 AM
A
PASS
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD16-02742
BLD-Energy code compliance
8/7/2017
8/8/2017
8/8/2017 9:27:35 AM
A
PASS
Sam Phone #: ###-####. . Rigid insulation on stemwall under slab on grade.
BLD16-02743
BLD-Energy code compliance
8/7/2017
8/8/2017
8/8/2017 9:27:17 AM
A
PASS
Sam Phone #: ###-####. . Rigid insulation on stemwall under slab on grade.
BLD16-02744
BLD-Energy code compliance
8/7/2017
8/8/2017
8/8/2017 9:26:58 AM
A
PASS
Sam Phone #: ###-####. Rigid insulation on stemwall under slab on grade.
BLD17-01114
BLD-Final
8/7/2017
8/8/2017
8/8/2017 9:26:04 AM
A
PASS
Steve Phone #: ###-####
BLD17-01114
DOC - Permit Finaled
8/8/2017
8/8/2017
8/8/2017 9:25:56 AM
P
PASS
BLD17-00810
BLD-Aging Inspection
8/8/2017
8/8/2017
8/8/2017 7:30:50 AM
CANC
MIS16-00358
DOC - Permit Finaled
8/8/2017
8/8/2017
8/8/2017 7:30:21 AM
P
PASS
MIS17-00110
MIS-Aging Inspection
8/8/2017
8/8/2017
8/8/2017 7:29:17 AM
PASS
MIS17-00110
DOC - Permit Finaled
8/8/2017
8/8/2017
8/8/2017 7:29:06 AM
A
PASS
demo permit issued.
MIS17-00111
MIS-Aging Inspection
8/8/2017
8/8/2017
8/8/2017 7:28:43 AM
PASS
MIS17-00111
DOC - Permit Finaled
8/8/2017
8/8/2017
8/8/2017 7:28:35 AM
A
PASS
Demo permit issued