MIS18-00295
| BLD-Conference | 8/6/2018 | 8/6/2018 | | A | |
|
|
doing re roof w/o permits-only have a patio cover permit
|
BLD17-02329
| BLD-Framing/Rough-in | 8/8/2018 | 8/8/2018 | 8/8/2018 4:59:04 PM | P | NR |
|
|
Chase for range venting in bonus area and ductless lines in upstairs closet will be completed Thursday along with any other needed rough-in repairs following inspection. Thank you. Phone #: ###-#### Inspection requested via web by James Jackson. mech. rough in failed.
|
BLD18-01173
| BLD-Framing/Rough-in | 8/8/2018 | 8/8/2018 | 8/8/2018 3:58:09 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs to remove all sheetrock and insulation for framing inspection.
|
BLD18-01839
| BLD-Foundation | 8/8/2018 | 8/8/2018 | 8/8/2018 3:18:17 PM | P | PASS |
|
|
|
BLD18-01175
| BLD-Foundation | 8/8/2018 | 8/8/2018 | 8/8/2018 3:10:51 PM | P | PASS |
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro. Foundatio and basement walls ok.
|
BLD18-02286
| BLD-Foundation | 8/8/2018 | 8/8/2018 | 8/8/2018 2:42:18 PM | P | PART |
|
|
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo. Basement walls ok. Noted footing on garage foundation had vertical reinforcement at 4ft. oc. Approved plans and engineering shows verts at 18 inches oc. Spoke to Kaleb Jones with Performance engineers, he noted that 4ft. verts in this area only is ok. Kaleb to send me new deatl with his stamp showing this.
|
BLD17-02078
| BLD-Wall cover | 8/8/2018 | 8/8/2018 | 8/8/2018 1:59:04 PM | P | NH |
|
|
Between 3:00-4:00 if possible today. I am canceling the request for inspection tomorrow as I don''t have anyone to be present during walk through. Phone #: ###-#### Inspection requested via web by Mira Piva. No access to rojoect. it is gated and locked. No inspection.
|
BLD18-02661
| BLD-Foundation | 8/8/2018 | 8/8/2018 | 8/8/2018 1:33:28 PM | P | CANC |
|
|
stem wall- call if you can come early-Zach Phone #: ###-####
|
BLD18-02661
| BLD-Energy code compliance | 8/8/2018 | 8/8/2018 | 8/8/2018 1:33:22 PM | P | PART |
|
|
stem wall- call if you can come early-Zach Phone #: ###-####. Rigid insulation on stemwall. work in progress.
|
BLD18-01191
| BLD-Concrete | 8/8/2018 | 8/8/2018 | 8/8/2018 1:18:43 PM | P | PASS |
|
|
Requesting a slab on grade reinforcing inspection for this afternoon. Concrete placement will be tomorrow 8/9 at 4:30am. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Interior slab on grade and interior thickend footings.
|
BLD18-00053
| BLD-Final | 8/7/2018 | 8/8/2018 | 8/8/2018 10:41:26 AM | A | PART |
|
|
Cecil Phone #: ###-####. Ok for temp occ for phase 1. Phase to be started in feb or march of 2019 (infusion room) will Need to request extnsion after 90 days.
|
BLD18-01839
| BLD-Foundation | 8/7/2018 | 8/8/2018 | 8/8/2018 10:05:59 AM | A | NR |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. No inspection. Will need to rescedule.
|
BLD18-00670
| BLD-Footing | 8/7/2018 | 8/8/2018 | 8/8/2018 10:03:30 AM | A | PASS |
|
|
Cal Phone #: ###-####. Garage footings.
|
BLD18-00796
| BLD-Footing | 8/7/2018 | 8/8/2018 | 8/8/2018 9:15:28 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by KJ Savaria. Work in progress. Pending special inspection.
|