Inspections for the day of: Wednesday, August 8, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Reynolds
TitleMEC INSPECTOR
Phone #208-803-2395
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC18-03710 Final8/8/20188/8/20188/9/2018 4:32:26 PMPFAIL
There should be access in the store to get on the roof. Phone #: ###-#### Inspection requested via web by Melissa Skinner- need weather tight conduit for rtu power
MEC18-03265 Final8/8/20188/8/20188/8/2018 3:26:14 PMPFAIL
Office is open from 9-5 -- Phone #: ###-#### Inspection requested via web by Justin Osterhout
-A/C fuse size needs to be a 50 amp- line set penetration needs sealed- insulation on the line set at the indoor unit needs fixed
MEC18-03869 Final8/8/20188/8/20188/8/2018 2:26:58 PMPPASS
Please call John to ensure install is complete. Thank you! ###-#### Phone #: ###-#### Inspection requested via web by Rick Borg
- A/C coil ok
MEC18-03500 Pressure Test8/8/20188/8/20188/8/2018 2:04:21 PMPCANC
Please call on way: Gener ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- no pressure test
MEC18-03500 Rough-in8/8/20188/8/20188/8/2018 2:03:22 PMPPASS
Please call on way: Gener ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- venting for range hood ok
MEC17-05068 Final8/6/20188/8/20188/8/2018 1:45:55 PMPFAIL
Please call Leona at ###-#### to coordinate - customer is not able to be home until after 1pm. Phone #: ###-#### Inspection requested via web by Sabrina DeHority- need 6" clearances on furnace single wall flue pipe( flue is touching insulation on return duct)- lineset is missing insulation at the penetration through the house and at the A/C- fuse size needs to be a 20 amp
MEC18-02523 Final8/7/20188/8/20188/8/2018 11:20:51 AMAPASS
Phone #: ###-#### Inspection requested via web by Oleg Chervak- final ok
MEC18-02063 Final8/8/20188/8/20188/8/2018 11:20:34 AMPPASS
Amtoro Phone #: ###-####- final ok
MEC18-03305 Rough-in8/7/20188/8/20188/8/2018 10:46:04 AMAPASS
Phone #: ###-#### Inspection requested via web by Debbie Marino - R/I ok
MEC18-03305 Pressure Test8/7/20188/8/20188/8/2018 10:45:47 AMAPASS
Phone #: ###-#### Inspection requested via web by Debbie Marino
20lb gas pressure test ok
MEC18-03846 Final8/8/20188/8/20188/8/2018 9:57:07 AMAPASS
Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace ac coil ok
MEC18-03065 Rough-in8/7/20188/8/20188/8/2018 8:55:00 AMAPASS
Phone #: ###-#### Inspection requested via web by Jason Baxter- R/I ok- 20lb gas pressure test ok
MEC18-03869 Final8/8/20188/8/20188/8/2018 8:03:09 AMPCANC
Please call John to ensure install is complete. Thank you! ###-#### Phone #: ###-#### >> Inspection requested via web by Rick Borg Inspection cancelled from web by: Rick Borg
MEC18-03589 Final8/6/20188/8/20188/7/2018 3:05:08 PMPCANC
Please call Jeff Morgan prior to inspection. ###-#### Phone #: ###-#### >> Inspection requested via web by Mary LaFayette Inspection cancelled from web by: Mary LaFayette