ELE17-02807
| ELE-Aging Inspection | 8/8/2019 | 8/8/2019 | 8/9/2019 1:06:52 PM | | PASS |
|
|
Added a final inspection to close out this permit. No other work was done.
|
ELE19-02363
| Rough-In Permanent Service | 8/8/2019 | 8/8/2019 | 8/8/2019 2:32:50 PM | P | PASS |
|
|
Units 101 and 104 Rough in permanent service inspection Phone #: ###-#### Inspection requested via web by Cevyn Recla p/s u/g n ok both units
|
ELE18-03135
| Final | 8/8/2019 | 8/8/2019 | 8/8/2019 2:10:11 PM | P | PASS |
|
|
Ok final. Disc and listing present.
|
ELE18-03135
| Electrical Rough-In | 8/8/2019 | 8/8/2019 | 8/8/2019 2:08:34 PM | P | PASS |
|
|
Install monument sign. Requesting 12:00 noon inspection Phone #: ###-#### Inspection requested via web by Ken Olsen Ok cover. Listing and disc present. Added a final also. Yesco was installing sign at time of inspection.
|
ELE19-02954
| Conference | 8/7/2019 | 8/8/2019 | 8/8/2019 1:31:34 PM | A | DONE |
|
|
Call to meet // Josh Phone #: ###-#### Discussed outlet layout and the requirement for dedicated circuits, ex. kitchen, baths etc. Also discussed service requirements.
|
ELE19-02910
| Electrical Rough-In | 8/7/2019 | 8/8/2019 | 8/8/2019 1:21:02 PM | P | PASS |
|
|
Please inspect roof section wiring. Phone #: ###-#### Inspection requested via web by ERIC CENTERS Ok cover west side of house. Wires run before roof is to be completed. Get your tools on Eric!!
|
ELE19-02832
| Temporary Service | 8/8/2019 | 8/8/2019 | 8/8/2019 12:47:44 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bonnie Page t/s u/g n ok
|
ELE18-04546
| Final | 8/8/2019 | 8/8/2019 | 8/8/2019 12:00:11 PM | P | PART |
|
|
Partial Phone #: ###-#### Inspection requested via web by Eric Brown Partial final for move in in main floor mstr, down shop, bed and bath and excersize room. If furniture moved in in other areas not listed, all furniture will need to be atleast 3' away from all walls.
|
ELE16-02437
| Electrical Rough-In | 8/8/2019 | 8/8/2019 | 8/8/2019 11:58:26 AM | P | PASS |
|
|
Wayne ###-#### Ok cover. Nail plates completed.
|
ELE16-02437
| Final | 8/8/2019 | 8/8/2019 | 8/8/2019 11:58:06 AM | P | CANC |
|
|
Phone #: 2088606259 >> Inspection requested via mobile web by Wayne Seeliger Should have been a RI for completing nail plates.
|
ELE19-02928
| Rough-In Permanent Service | 8/7/2019 | 8/8/2019 | 8/8/2019 10:58:37 AM | A | PASS |
|
|
Any questions plz let us know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren p/s u/g n ok
|
ELE19-02381
| Final | 8/7/2019 | 8/8/2019 | 8/8/2019 9:33:32 AM | A | PART |
|
|
###-#### #0912 Partial final for all areas except reception desk. Power is safed off and in a box with blank.
|
ELE19-02363
| Rough-In Permanent Service | 8/8/2019 | 8/8/2019 | 8/8/2019 8:28:38 AM | P | CANC |
|
|
Units 101 and 103 rough in permanent service inspections. Phone #: ###-#### >> Inspection requested via web by Cevyn Recla Inspection cancelled from web by: Cevyn Recla
|