BLD1052379
| INSP - Conference | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | | FAIL |
|
|
/ / 342 - address previous c/n even if finalled
|
BLD96-01070
| INSP - Carpentry | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | | PART |
|
|
/ / 342 - use 5/8's gwb at stairs even in unfinished portion
|
BLD96-01070
| INSP - Conference | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | | PASS |
|
|
/ / 342 - install handrail in unfinished portion
|
BLD1053904
| INSP - Conference | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | A | PART |
|
|
temp glass resubmittal is being sent by arch. c/n stays
|
BLD1053904
| INSP - Final | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | A | PART |
|
|
temp occ ok
|
BLD1053907
| INSP - Conference | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | A | PART |
|
|
discussed temp glass; a resubmittal is pending from arch
|
BLD1053907
| INSP - Final | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | A | PART |
|
|
temp occ ok c/n still outstanding
|
BLD95-00644
| INSP - Final | 8/8/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | A | PASS |
|
|
08/09/96 342 - REINSPECTION
|
BLD95-02164
| INSP - Flatwork | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | P | PART |
|
|
08/09/96 342 - slab 1:30 p.m. appointment
|
BLD96-00394
| INSP - Framing/Rough-in | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | P | FAIL |
|
|
08/09/96 342 - gable wall deflection, post connection, missing valley bo
|
BLD96-00931
| INSP - Final | 8/6/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | P | PASS |
|
|
08/09/96 342 - FRI. P.M. OWNER WILL BE THERE.
|
BLD96-01472
| INSP - Framing/Rough-in | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | P | FAIL |
|
|
08/09/96 342 - truss modification
|
MEC96-02248
| INSP - Rough-in & Gas Pressure | 8/9/1996 | 8/9/1996 | 8/9/1996 12:00:00 AM | P | PART |
|
|
08/09/96 342 - ###-#### JOHN PRICE. PLEASE CALL IF YOU NEED TO SPEAK WIT
|