Inspections for the day of: Monday, August 9, 1999.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-01547 INSP - Foundation8/9/19998/9/19998/9/1999 12:00:00 AM FAIL
/ / 340 - FND POURED; PENDING ENG'S OK. SUPT. NOTIFIED
BLD99-01590 INSP - Framing/ Rough-in8/9/19998/9/19998/9/1999 12:00:00 AM PASS
/ / 340 - MADE OK
BLD99-01237 INSP - Framing/ Rough-in8/9/19998/9/19998/9/1999 12:00:00 AM FAIL
/ / 340 - CONF W BLDR; NED RESUB FOR REVISIONS
BLD99-00650 INSP - Framing/Rough-in8/6/19998/9/19998/9/1999 12:00:00 AMAPART
08/09/99 340 - grid okpending elec/fire [8693080].
BLD99-00969 INSP - Framing/Rough-in8/7/19998/9/19998/9/1999 12:00:00 AMAPART
08/09/99 340 - east shear walls ok; part no. side gyp ok for 1 hr. Hello
BLD99-01027 INSP - Framing/Rough-in8/6/19998/9/19998/9/1999 12:00:00 AMAPART
08/09/99 340 - REINSPECTION. RICH ###-####; part, add rest 45 deg strut
BLD99-01232 INSP - Foundation8/6/19998/9/19998/9/1999 12:00:00 AMAPART
08/09/99 340 - CRAIG BAKER ###-#### FOOTING; int ftgs, part. met arch on
BLD99-00975 INSP - Framing/Rough-in8/9/19998/9/19998/9/1999 12:00:00 AMPPART
08/09/99 340 - SHAWN ###-####-ok pend elec ok at 3 south bays( 4 Gap Sto
BLD99-01590 INSP - Energy code compliance8/9/19998/9/19998/9/1999 12:00:00 AMPPASS
08/09/99 340 - dave lerner-8886326 energy code insp
BLD99-02188 INSP - Framing/Rough-in8/9/19998/9/19998/9/1999 12:00:00 AMPFAIL
08/09/99 340 - need plbg r/i Scheduled by Hello!. Contact phone is [870
BLD99-01424 INSP - Framing/Rough-in8/9/19998/9/19998/9/1999 12:00:00 AMPFAIL
08/09/99 340 - ; c/n, firestops, wallbraces, med gas system CECIL 383-87