Inspections for the day of: Wednesday, August 9, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE00-02932 Rough-In Permanent Service8/8/20008/9/20008/9/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/08/2000 at 12:28:27. Contact: ###-####. ok per instructions to contractor by Jim 8/9/2000 11:54:39 AM
ELE00-02690 Rough-In Permanent Service8/8/20008/9/20008/9/2000 12:00:00 AMAFAIL
###-#### main bonding jumper connect GEC to neutral 8/9/2000 11:52:42 AM
ELE00-02831 Final8/8/20008/9/20008/9/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/08/2000 at 13:29:02. Contact: ###-####.
ELE00-03058 Temporary Service8/8/20008/9/20008/9/2000 12:00:00 AMAFAIL
TMP POLE ONLY HP-- ###-#### Contamination unused openings wire depth ground rod 8/9/2000 11:51:20 AM
ELE00-01714 Final8/8/20008/9/20008/9/2000 12:00:00 AMAFAIL
PER PAT BETWEEN 8:30 & 9----JEFF ###-#### --FN Reversed polarity and GFCI wet bar 8/9/2000 11:53:21 AM
ELE00-02923 Rough-In Permanent Service8/9/20008/9/20008/9/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/09/2000 at 08:13:16. Contact: ###-####. p/s ok 8/9/2000 5:15:02 PM
ELE00-01538 Final8/9/20008/9/20008/9/2000 12:00:00 AMPCANC
Jim ###-#### gave to joe 8/9/2000 5:13:03 PM
ELE00-02994 Temporary Service8/9/20008/9/20008/9/2000 12:00:00 AMPFAIL
###-#### kevin for t/p--accross from golf course-dummy add fusing 8/9/2000 5:12:45 PM
ELE00-02316 Final8/9/20008/9/20008/9/2000 12:00:00 AMPCANC
Dawn ###-#### made other arrangements 8/9/2000 5:15:52 PM
ELE00-03057 Electrical Rough-In8/8/20008/9/20008/9/2000 12:00:00 AMPFAIL
Jeff Tanner ###-#### as late in the pm as possible make-up boxfill 8/9/2000 5:14:12 PM