BLD00-02332
| BLD-Concrete | 8/8/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | A | PASS |
|
|
joel--###-#### cell - concrete sidewalk 8/9/2000 12:00:40 PM
|
MEC00-02679
| Rough-in | 8/8/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | A | FAIL |
|
|
###-#### cn posted 8/9/2000 12:01:34 PM
|
MEC00-02679
| Pressure Test | 8/8/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | A | PASS |
|
|
jan ###-####
|
MEC00-02647
| Final | 8/8/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | A | NH |
|
|
gas line pool heater ###-#### reinspection no access 8/9/2000 12:01:07 PM
|
BLD00-00078
| BLD-Final | 8/8/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | A | CANC |
|
|
Terry, ###-####
|
BLD00-02107
| BLD-Foundation | 8/9/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | P | PART |
|
|
stem walls ###-#### incomplete 8/9/2000 12:02:07 PM
|
BLD00-01633
| BLD-Framing/Rough-in | 8/9/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/09/2000 at 08:59:13. Contact: ###-####.
|
BLD00-02272
| BLD-Footing | 8/9/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | P | PART |
|
|
Jerry ###-####
|
BLD00-02270
| BLD-Footing | 8/9/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | P | PART |
|
|
###-####
|
BLD00-01248
| BLD-Final | 8/7/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2000 at 10:56:32. Contact: ###-####.
|