BLD00-01901
| BLD-Energy code compliance | 8/8/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/08/2000 at 12:50:20. Contact: ###-####.
|
BLD00-02104
| BLD-Footing | 8/8/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | A | PART |
|
|
kevin ###-####
allready poured, appears ok 8/9/2000 4:19:12 PM
|
BLD00-01180
| BLD-Foundation | 8/8/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 415 On 8/8/2000 todd 371 7800
WIP appears ok 8/9/2000 4:20:02 PM
|
BLD00-01030
| BLD-Footing | 8/8/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | P | PART |
|
|
Jay Jones ###-#### early afternoon
ok with verbal corrections 8/9/2000 1:01:45 PM
|
BLD00-00142
| BLD-Other | 8/9/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | P | PART |
|
|
Bob ###-####
fire wall nailing on rear lower unit
ok to stand wall 8/9/2000 3:15:06 PM
|
BLD00-00928
| BLD-Other | 8/9/2000 | 8/9/2000 | 8/9/2000 12:00:00 AM | P | NH |
|
|
Scheduled by a contractor via Hello! on 08/09/2000 at 09:49:02. Contact: .
C/N left to recall inspection , have trades signed off, seal outside penatrations, and approved plans on site 8/9/2000 2:04:05 PM
|