ELE01-02714
| Rough-In Permanent Service | 8/7/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 10:39:54. Contact: ###-####. ele r/i; perm/svc.
p/s ug n boise basin ele #2714-ok 8/9/2001 9:49:54 AM
|
ELE01-02245
| Electrical Rough-In | 8/8/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 10:23:04. Contact: ###-####. ufer grounding conductor ok for pour. 8/9/2001 10:24:25 AM
|
ELE01-02724
| Rough-In Permanent Service | 8/8/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 16:23:14. Contact: ###-####.
meter/service disconnect for cell-tower
p/s ug n alloway ele #2724
in back behind building. 8/9/2001 9:31:54 AM
|
ELE01-02705
| Temporary Service | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 07:04:45. Contact: ###-####.temporary service.
t/s ug chris conner #2705-ok 8/9/2001 11:45:28 AM
|
ELE01-02629
| Electrical Rough-In | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | P | NR |
|
|
###-####, roy: ###-####. not completed; changing some branch circuit wiring make-up.
contractor will reschedule. 8/9/2001 2:30:39 PM
|
ELE01-02627
| Electrical Rough-In | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | P | PASS |
|
|
re-insp r/i- mark ###-#### voice pager.
corrections completed. ok. 8/9/2001 11:20:34 AM
|
ELE99-02173
| Final | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | P | PASS |
|
|
###-#### call first please. corrections completedl ok. 8/9/2001 1:44:39 PM
|
ELE01-01649
| Final | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | P | PASS |
|
|
fn lloyd ###-####. completed. 8/9/2001 3:02:23 PM
|
ELE01-00851
| Electrical Rough-In | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | P | DONE |
|
|
###-#### shane
|