FIR01-00143
| FIR-Aging Inspection | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | | NR |
|
|
work in progress 8/9/2001 3:26:20 PM
|
FIR01-00298
| FIR-Aging Inspection | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | | NR |
|
|
work hasn't started 8/15/2001 11:24:23 AM
|
BLD01-01082
| FIRE-Final Inspection | 8/7/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 16:39:51. Contact: . no electrical power - couldn't verify battery backup for emergency lights and exit signs. alarms tested and passed 8/9/2001 9:35:40 AM
|
BLD00-02752
| FIRE-Final Inspection | 8/8/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 13:06:12. Contact: ###-####. items from previous correction notice weren't completed; fire sprinkler preaction system air pressure switch activated the "general fire alarm". alarm system not tested properly. reinspection fee added with parcel hold by Marsha per my request 8/9/2001 9:34:03 AM
|
BLD01-01449
| FIRE-Final Inspection | 8/8/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | A | PASS |
|
|
Josh ###-####
|
FIR01-00306
| INSP-Final Inspection | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 409 On 8/9/2001 7:57:13 AM
|
BLD01-01996
| FIRE-Final Inspection | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 8/9/2001 10:18:36 AM
|
FIR98-00258
| INSP-Final Inspection | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 8/9/2001 2:49:08 PM area fully sprinklered with preaction system; okay to remove FM 200 system.
|
BLD01-01696
| FIRE-Sprinkler Rough-in | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 409 On 8/9/2001 3:23:12 PM couldn't gain entry
|
BLD00-03594
| FIRE-Final Inspection | 8/9/2001 | 8/9/2001 | 8/9/2001 12:00:00 AM | P | PASS |
|
|
fire insp dan ###-####
|