Inspections for the day of: Thursday, August 9, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01726 BLD-Framing/Rough-in8/8/20018/9/20018/9/2001 12:00:00 AMAPART
###-####
BLD01-01728 BLD-Framing/Rough-in8/8/20018/9/20018/9/2001 12:00:00 AMAPART
###-####
ext. shear nailing ok, need 3 hold downs, will verify at framing 8/9/2001 11:07:28 AM
BLD01-00919 BLD-Framing/Rough-in8/8/20018/9/20018/9/2001 12:00:00 AMAFAIL
FR -RE-INSP RICH ###-####
c/n posted, ok to side main level pending engineer approval 8/9/2001 11:06:14 AM
MEC01-02306 Rough-in8/8/20018/9/20018/9/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/08/2001 at 14:46:43. Contact: .
MEC01-02055 Rough-in8/8/20018/9/20018/9/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 08/08/2001 at 15:19:45. Contact: ###-####.
BLD01-01390 BLD-Energy code compliance8/8/20018/9/20018/9/2001 12:00:00 AMAPART
###-####
still need energy calc. and finish duct on fan upstairs 8/9/2001 12:48:44 PM
BLD01-01857 BLD-Final8/8/20018/9/20018/9/2001 12:00:00 AMAPASS
###-####
MEC01-02320 Final8/8/20018/9/20018/9/2001 12:00:00 AMAFAIL
FN INSP- STEVEN- ###-#### FOR HOMEOWNER--EARLY IF POSSIBLE
c/n posted, need flex at furnace 8/9/2001 11:05:11 AM
MEC01-02151 Rough-in8/8/20018/9/20018/9/2001 12:00:00 AMACANC
###-####
MEC01-01783 Rough-in8/8/20018/9/20018/9/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/08/2001 at 16:54:39. Contact: ###-####.
BLD00-03484 BLD-Final8/9/20018/9/20018/9/2001 12:00:00 AMPPASS
fn occ -daniel ###-####
c of c issued 8/9/2001 5:51:48 PM
BLD01-00691 BLD-Framing/Rough-in8/9/20018/9/20018/9/2001 12:00:00 AMPPART
###-#### scott
verbal corrections on straps, fireblocks, post under truss, sheet rock shear, sheet rock backside of elec. panel, ok to insulate. 8/9/2001 3:10:35 PM
BLD01-01285 BLD-Framing/Rough-in8/7/20018/9/20018/9/2001 12:00:00 AMPPART
exterior shear & roof nailing - grant- ###-####
roof ok to dry sheet, conf. on stairs, other framing, shear not per plan 8/9/2001 3:07:29 PM
BLD00-02125 BLD-Foundation8/8/20018/9/20018/9/2001 12:00:00 AMPPART
FOR HOMEOWNER ###-#### FOUND
wip, verbal corrections 8/9/2001 5:52:38 PM
BLD01-00998 BLD-Framing/Rough-in8/8/20018/9/20018/9/2001 12:00:00 AMPPART
###-####
c/n posted on back side of plans, ok to insulate 8/9/2001 6:20:46 PM