PLM02-02462
| Sprinkler (Final) | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-02381
| Final | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/08/2002 at 11:24:23. Contact: ###-####.
|
PLM02-02464
| Sprinkler (Final) | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-02468
| Plumbing Rough-in | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PASS |
|
|
###-#### CRAIG whirl pool access is on the left side in back by the shower access from outside will be tough 8/9/2002 1:39:19 PM
|
PLM02-01566
| Final | 8/9/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 07:59:21. Contact: ###-####. sprinkler permit required, sprinkler tir in was done by s/w installer provide a copy of the sewer maintenance agreement, 8/9/2002 4:37:34 PM
|
PLM02-02470
| Water and/or Sewer | 8/9/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | PASS |
|
|
###-#### vaughn
|
PLM02-00906
| Groundwork | 8/9/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 08:50:54. Contact: ###-####. gw 1ST FLOOR ROOMS 144 & 145 and dom. water mains 2nd floor test ok 8/9/2002 3:25:01 PM
|
PLM02-02365
| Plumbing Rough-in | 8/9/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 10:13:21. Contact: ###-####. ladder required for water heater, install t&p drain to exterior. 8/9/2002 4:20:19 PM
|