BLD01-01983
| BLD-Final | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | NR |
|
|
###-#### late am
|
MEC01-02521
| Final | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | NR |
|
|
###-####
|
BLD02-00967
| BLD-Conference | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | NR |
|
|
recall for 8-12 8/9/2002 9:08:01 AM
|
BLD02-01372
| BLD-Framing/Rough-in | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PART |
|
|
###-#### PETE, 8/9/2002 11:08:22 AM; walls ok ok to cover ( rest pending hvac ok at roof.) 8/9/2002 11:17:00 AM
|
BLD01-02876
| BLD-Final | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | CANC |
|
|
###-#### - Tim - call 1st
|
BLD02-01490
| BLD-Framing/Rough-in | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | FAIL |
|
|
###-#### call first to meet there for access; 8/9/2002 1:10:34 PM
|
BLD02-01490
| BLD-Framing/Rough-in | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | FAIL |
|
|
###-#### call first to meet there for access...add'l c/n ok to insul only....need egress windo 8/9/2002 12:06:37 PM w 2nd fl 8/9/2002 12:06:47 PM
|
MIS02-00002
| BLD-Conference | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PASS |
|
|
###-#### PAT NEEDS TO HAVE PERMIT EXTENDED...ok per tim h. 8/9/2002 3:04:20 PM
|
BLD02-00163
| BLD-Conference | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PASS |
|
|
NEEDS PERMIT EXTENSION ###-#### PAT ok per tim h. 8/9/2002 3:04:30 PM
|
BLD02-01263
| BLD-Framing/Rough-in | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PART |
|
|
###-####... 8/9/2002 3:05:18 PM
|
BLD02-01921
| BLD-Final | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PART |
|
|
###-####...walls ok 8/9/2002 1:18:13 PM
|
MEC02-01969
| Final | 8/1/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PASS |
|
|
JULIE ###-#### as early as possible
|
BLD02-01528
| BLD-Framing/Rough-in | 8/6/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | FAIL |
|
|
###-#### chris c/n, ladder & roof frame, need elec r/i; instll windows, nail sheathing, etc. 8/9/2002 10:59:57 AM
|
BLD02-00421
| BLD-Conference | 8/9/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | A | PASS |
|
|
re exist ftg/ c/n of 8-9 w/ Pat, conc. contractor, new ftg ok,,,existing req's analysis 8/9/2002 6:00:18 PM
|
BLD01-02801
| BLD-Final | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/08/2002 at 08:54:34. Contact: ###-####...need smoke dets. 8/9/2002 5:37:17 PM
|
BLD02-00421
| BLD-Footing | 8/9/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 07:45:58. Contact: ###-####....c/n re existing construction...need proper details, new partial fnd looks ok. 8/9/2002 5:20:15 PM
|
MEC02-02114
| Final | 8/9/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 08:38:15. Contact: ###-####...ok per 420 8/9/2002 5:39:09 PM
|
MEC02-00882
| Conference | 8/9/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | PASS |
|
|
gas test/pipe only 8/9/2002 5:56:00 PM
|
MEC02-00094
| Conference | 8/9/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | PASS |
|
|
gas pipe only 8/9/2002 5:54:56 PM
|
BLD01-02840
| BLD-Final | 8/8/2002 | 8/9/2002 | 8/9/2002 12:00:00 AM | P | PASS |
|
|
later pm ###-####
|