FIR05-00448
| INSP-Sprinkler Rough-in | 8/9/2005 | 8/9/2005 | 8/10/2005 9:07:53 AM | P | PART |
|
|
Please call prior to inspection jeff; Phone #: ###-#### Rough-in is passed. Items that need corrected are uprights located along a north/south draft stop are spaced at 156 sq. ft. Contractor needs to provide verification that this spacing is approved. Also one upright head needs to be re-installed to correct an overspacing issue. See plans for location. The existing insulation that is installed on the underside of the roof deck is falling on the sprinkler piping and creating obstructions and needs repaired prior to installation of the ceiling tile. Annual inspection is needed and spare heads need to be placed in head box. Final spacing of pendants will be verified when t-bar and ceiling tile is installed. New hvac unit may create obstruction to uprights when installed and will need to be verified. Fire alarm panel is in trouble condition.
|
FIR05-00170
| INSP-Final Inspection | 8/9/2005 | 8/9/2005 | 8/9/2005 4:02:35 PM | P | PASS |
|
|
(dry system trip test)call Jonathan for details. Thanks; Phone #: ###-#### Dry system tripped in 34.9 seconds. Monitoring agency received signals. Permit finaled.
|
FIR04-00664
| INSP-Sprinkler Rough-in/Hydro | 8/8/2005 | 8/9/2005 | 8/9/2005 4:01:41 PM | P | FAIL |
|
|
Contact: Chris Lamb - Hydro Test Wet And Anti Freeze system; Phone #: ###-#### Hydro test of the anti-freeze loop failed and the overhead wet system would have passed if the piping from the check valve to the FDC had been included. Need to retest system
|
BLD05-01202
| FIRE-Final Inspection | 8/9/2005 | 8/9/2005 | 8/9/2005 3:19:51 PM | P | FAIL |
|
|
shawn--fire life safely; Phone #: ###-#### Provide fire extinguishers per review comment #4. Provide approved door hardware per review comments #6 & #7
|
FIR05-00416
| INSP-Final Inspection | 8/8/2005 | 8/9/2005 | 8/9/2005 3:16:36 PM | P | PASS |
|
|
Fire alarm finaled
|
BLD05-00755
| FIRE-Final Inspection | 8/9/2005 | 8/9/2005 | 8/9/2005 3:14:02 PM | P | PASS |
|
|
Fire life safety finaled
|
FIR05-00170
| INSP-Alarm Testing | 8/9/2005 | 8/9/2005 | 8/9/2005 3:00:04 PM | P | PASS |
|
|
(dry system trip test)call Jonathan for details. Thanks; Phone #: ###-#### Dry system tripped in 34.9 seconds. Monitoring agency received signals. Permit finaled.
|
FIR05-00478
| INSP-Supply line flush | 8/9/2005 | 8/9/2005 | 8/9/2005 12:28:13 PM | P | PART |
|
|
Inspection was for cover of the supply piping located under the walkway. See approved drawings for exact location. No thrust blocking has been done yet.
|
FIR05-00333
| INSP-Final Inspection | 8/8/2005 | 8/9/2005 | 8/9/2005 12:26:51 PM | A | PASS |
|
|
Permit finaled
|
FIR05-00197
| INSP-Final Inspection | 8/9/2005 | 8/9/2005 | 8/9/2005 12:17:55 PM | P | PASS |
|
|
Fire sprinkler permit finaled
|
FIR05-00129
| INSP-Final Inspection | 8/9/2005 | 8/9/2005 | 8/9/2005 11:52:52 AM | P | PASS |
|
|
fire sprinkler permit finaled
|
BLD04-02272
| FIRE-Final Inspection | 8/8/2005 | 8/9/2005 | 8/9/2005 11:38:37 AM | A | FAIL |
|
|
ben ; Phone #: ###-#### The hvac units still will not go into heat mode for testing. Sample tubes have been fixed.
|
BLD05-01421
| FIRE-Final Inspection | 8/9/2005 | 8/9/2005 | 8/9/2005 10:49:28 AM | P | PASS |
|
|
Life safety finaled
|
MIS05-00100
| FIR-Final | 8/8/2005 | 8/9/2005 | 8/9/2005 10:42:21 AM | A | PASS |
|
|
jeff; Phone #: ###-#### Life safety finaled
|
FIR05-00324
| INSP-Final Inspection | 8/8/2005 | 8/9/2005 | 8/9/2005 10:27:02 AM | A | PASS |
|
|
fire alarm permit finaled
|
FIR05-00124
| INSP-Sprinkler Rough-in/Hydro | 8/8/2005 | 8/9/2005 | 8/9/2005 9:10:57 AM | A | PASS |
|
|
Eq bracing on the cpvc main is done and the pendant heads are now correct. Need to inspect the dry system and hydro test the wet system and all other final items.
|