FIR05-00037
| INSP-Final Inspection | 8/2/2006 | 8/3/2006 | | P | |
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 8/8/2006 | 8/9/2006 | 8/10/2006 7:31:16 AM | P | PART |
|
|
7th floor guest room rough-in and items from previous c/n on this floor are complete.
|
FIR06-00486
| INSP-Sprinkler Rough-in | 8/8/2006 | 8/9/2006 | 8/10/2006 7:29:34 AM | P | PART |
|
|
Overhead rough-in is good for cover at the drop ceiling areas, noted hanger at arm-over for one head in an office is overspaced and an ssu above the office to be removed.
|
FIR04-00674
| INSP-Sprinkler Rough-in/Hydro | 8/8/2006 | 8/9/2006 | 8/10/2006 7:25:45 AM | P | PART |
|
|
Overhead hydrostatic test passed inspection.
|
BLD06-00056
| FIRE-Final Inspection | 8/8/2006 | 8/9/2006 | 8/9/2006 12:13:43 PM | A | PASS |
|
|
Items on previous c/n have been completed, certification for the new extinguishers to be performed today.
|