Inspections for the day of: Tuesday, August 9, 2011.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00239 INSP-Sprinkler Rough-in/Hydro8/9/20118/9/20118/10/2011 3:45:06 PMPPART
Completed hydrostatic testing of both building #2 and building #3 1st floor antifreeze systems.
FIR11-00026 INSP-Final Inspection8/8/20118/9/20118/9/2011 5:41:31 PMAFAIL
Noted items during initial walkthrough include 1st floor- provide WP notification devices at shower 140 and unisex 117, notification at study rooms 119A and 119B are overspaced, noted two added ID at store room 115 not shown on plans. 2nd floor- provide signage at the FACP room, install a SD at the panel room, TS, PS and FS at the preaction riser are not shown on plans, hall 212A and 212B notification devices are overspaced/obstructed, IT tech room A/V is overspaced. 3rd floor- casual seating area lacks visual coverage, hall 345 is overspaced. Provide record of inspection and testing including a list of signals per fire code review notes. See also items # 2,3, 7, and 33 on review comments. Post accurate map at the panel. Field modifications including two additional ID, 14 relay modules for AHU shutdown, 4 fire sprinkler monitor modules, and 3 DH to be shown on resubmital plans and matrix as discussed.
BLD11-00969 FIRE-Final Inspection8/9/20118/9/20118/9/2011 5:25:12 PMPPASS
Fire life safety inspection completed satisfactory.
FIR11-00385 INSP-Final Inspection8/9/20118/9/20118/9/2011 5:22:57 PMPPASS
Scope of fire alarm work completed. Permit final approved.
FIR10-00540 INSP-Final Inspection8/4/20118/9/20118/9/2011 5:20:35 PMANR
BLD10-01578 FIRE-Final Inspection8/9/20118/9/20118/9/2011 5:20:03 PMPPASS
Fire life safety final inspection passed.
BLD10-01036 FIRE-Final Inspection8/9/20118/9/20118/9/2011 5:19:28 PMPPASS
Fire life safety inspection passed.
BLD11-00483 FIRE-Final Inspection8/9/20118/9/20118/9/2011 5:18:30 PMPFAIL
C/N items include; provide one extinguisher at the mechanical room, missing EM lighting at the excercise room, repair exit signs and EM lights at the adjacent exit access. Refer to plan sheet key notes for details and red line annotations.
FIR11-00308 INSP-Sprinkler Rough-in/Hydro8/8/20118/9/20118/9/2011 5:09:47 PMAPART
Overhead hydrostatic testing for the new dry system piping passed. Discussed schedule for pneumatic test.
FIR11-00039 INSP-Final Inspection8/8/20118/9/20118/9/2011 5:07:56 PMAPASS
Reinspection passed. Fire alarm permit finaled.
FIR11-00038 INSP-Final Inspection8/8/20118/9/20118/9/2011 5:05:37 PMAPASS
Reinspection for noted correction items passed. Fire alarm permit finaled.
BLD11-01511 FIRE-Final Inspection8/8/20118/9/20118/9/2011 5:03:26 PMAPASS
Reinspection for noted correction items passed.
FIR11-00197 INSP-Final Inspection8/1/20118/9/20118/9/2011 5:02:08 PMAPASS
Fire alarm work passed after hours re-inspection. Permit finaled.
FIR11-00180 INSP-Final Inspection8/9/20118/9/20118/9/2011 5:01:01 PMAPASS
Fire sprinkler permit passed final inspection.