MIS10-00340
| MIS-Aging Inspection | 8/9/2011 | 8/9/2011 | 8/12/2011 11:14:53 AM | | DONE |
|
|
|
BLD05-02835
| BLD-Framing/Rough-in | 8/9/2011 | 8/9/2011 | 8/9/2011 4:59:34 PM | P | FAIL |
|
|
douglas Phone #: ###-####,, will meet on site next week,, also needs to have the truss company ok the weathered trusses prior to anything
|
BLD11-01284
| BLD-Framing/Rough-in | 8/9/2011 | 8/9/2011 | 8/9/2011 4:58:10 PM | P | PART |
|
|
Micah Phone #: ###-####,, need a brace on one truss by the entry,( on the bearing leg,), ok to insulate
|
BLD11-00477
| BLD-Conference | 8/9/2011 | 8/9/2011 | 8/9/2011 4:56:45 PM | P | PART |
|
|
mike Phone #: ###-####,, conf on soffits,, need 2 layers
|
BLD11-01242
| BLD-Wall cover | 8/9/2011 | 8/9/2011 | 8/9/2011 4:48:38 PM | P | PASS |
|
|
Sheer inspection-Dave Phone #: ###-####,, exterior ok to cover
|
BLD11-01593
| BLD-Footing | 8/9/2011 | 8/9/2011 | 8/9/2011 4:08:00 PM | P | PART |
|
|
miles - rebar Phone #: ###-####,, work in progress on storage room walls, replacement retaining wall,,(less than 4'),, new stair supports,, ok to pour when ready
|
BLD11-01350
| BLD-Footing | 8/9/2011 | 8/9/2011 | 8/9/2011 3:27:05 PM | P | PART |
|
|
bill Phone #: ###-####,, work in progress,, ok to pour when ready
|
BLD11-00416
| BLD-Framing/Rough-in | 8/8/2011 | 8/9/2011 | 8/9/2011 2:58:41 PM | A | PART |
|
|
framing, hold down & roofing//John Sanchez Phone #: ###-####,, fireblocking,, work in progress,, ok
|
BLD10-01195
| BLD-Final | 8/5/2011 | 8/9/2011 | 8/9/2011 2:44:28 PM | A | NH |
|
|
|
BLD11-01242
| BLD-Framing/Rough-in | 8/8/2011 | 8/9/2011 | 8/9/2011 1:44:48 PM | A | PART |
|
|
Sheer inspection-Dave Phone #: ###-####,, shear ok on exterior
|
BLD11-01639
| BLD-Final | 8/8/2011 | 8/9/2011 | 8/9/2011 12:33:43 PM | A | FAIL |
|
|
john Phone #: ###-####,, need gripable handrails,, need max 4" spacing on deck area guardrail
|
BLD11-01350
| BLD-Footing | 8/8/2011 | 8/9/2011 | 8/9/2011 12:02:54 PM | A | NR |
|
|
bill Phone #: ###-####
|