FIR12-00291
| INSP-Alarm Testing | 8/9/2012 | 8/9/2012 | 8/9/2012 4:59:30 PM | P | PART |
|
|
Regarding duct detectors for units below 2000 cfm.
|
BLD12-01773
| FIRE-Final Inspection | 8/9/2012 | 8/9/2012 | 8/9/2012 4:58:33 PM | P | NR |
|
|
|
BLD12-02018
| FIRE-Sprinkler Rough-in | 8/9/2012 | 8/9/2012 | 8/9/2012 4:58:15 PM | P | PART |
|
|
Regarding existing system fire sprinkler coverage.
|
FIR12-00021
| INSP-Sprinkler Rough-in/Hydro | 8/9/2012 | 8/9/2012 | 8/9/2012 2:39:55 PM | P | PART |
|
|
UG fire supply line hydrostatic test completed satisfactory.
|
FIR12-00290
| INSP-Sprinkler Rough-in | 8/9/2012 | 8/9/2012 | 8/9/2012 2:38:29 PM | A | PART |
|
|
Okay to cover grid ceilings at the second floor offices, storage, hall and stairway areas.
|
BLD11-02317
| FIRE-Conference | 8/9/2012 | 8/9/2012 | 8/9/2012 2:37:10 PM | A | DONE |
|
|
Regarding NFPA 72 18.4.2.5 at the first floor level between buildings one, two and the annex.
|
FIR12-00358
| INSP-Sprinkler Rough-in | 8/8/2012 | 8/9/2012 | 8/9/2012 2:33:36 PM | A | PART |
|
|
Overhead modifications at the remodel area grid ceilings are approved for cover.
|