ELE13-01630
| Electrical Rough-In | 8/9/2013 | 8/9/2013 | 8/9/2013 3:49:05 PM | P | PART |
|
|
Please look at ufer on East side of building and 4 inch PVC running to the outside of the foundation. PVC heading north will be encased in concrete. Phone #: ###-#### >> Inspection requested via web by Dan Hardisty. 4 inch conduit ok. Footing on plastic, so 2 ground rods and tie to rebar ok with #4 copper. Ok to pour footing. Still needs ground rods for service inspection.
|
ELE13-02105
| Electrical Rough-In | 8/8/2013 | 8/9/2013 | 8/9/2013 3:02:50 PM | P | CANC |
|
|
benjamin Phone #: ###-####
|
ELE13-02105
| Final | 8/9/2013 | 8/9/2013 | 8/9/2013 3:02:30 PM | P | PASS |
|
|
benjamin Phone #: ###-####
|
ELE13-02105
| Rough-In Permanent Service | 8/9/2013 | 8/9/2013 | 8/9/2013 3:02:03 PM | A | PASS |
|
|
benjamin Phone #: ###-####. P/S Connect ok.
|
ELE13-00086
| Electrical Rough-In | 8/8/2013 | 8/9/2013 | 8/9/2013 2:16:31 PM | A | PASS |
|
|
2nd floor ceiling cover Phone #: ###-#### >> Inspection requested via web by Tyler Bowen. D line south ceiling 2nd floor ok to cover.
|
ELE13-01981
| Final | 8/8/2013 | 8/9/2013 | 8/9/2013 1:02:00 PM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Paige
|
ELE13-01982
| Final | 8/8/2013 | 8/9/2013 | 8/9/2013 12:44:05 PM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Paige
|
ELE13-02035
| Final | 8/7/2013 | 8/9/2013 | 8/9/2013 12:18:34 PM | P | PASS |
|
|
side garage door is open Phone #: ###-#### >> Inspection requested via web by Bryan Atkins
|
ELE13-02128
| Electrical Rough-In | 8/8/2013 | 8/9/2013 | 8/9/2013 12:00:39 PM | A | PASS |
|
|
Will open at 9:00 AM Phone #: ###-#### >> Inspection requested via web by Kevin Burke. New wall ok to cover.
|
ELE13-01867
| Final | 8/9/2013 | 8/9/2013 | 8/9/2013 11:35:37 AM | A | PASS |
|
|
all is good - Phone #: ###-#### >> Inspection requested via web by dennis mcneely
|
ELE13-02067
| Final | 8/8/2013 | 8/9/2013 | 8/9/2013 11:18:41 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk
|
ELE13-02067
| Temporary Service | 8/9/2013 | 8/9/2013 | 8/9/2013 11:18:29 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk. T/S connect ok.
|
ELE13-02118
| Conference | 8/8/2013 | 8/9/2013 | 8/9/2013 10:57:46 AM | A | DONE |
|
|
Due to the extent of fire damage I would prefer to consult with the inspector before work commences. Phone #: ###-#### >> Inspection requested via web by David McClellan
|