MIS13-00078
| MIS-Aging Inspection | 8/9/2016 | 8/9/2016 | 8/10/2016 2:15:05 PM | | PEND |
|
|
|
BLD15-03503
| BLD-Aging Inspection | 8/9/2016 | 8/9/2016 | 8/10/2016 2:13:38 PM | | PEND |
|
|
|
BLD15-04538
| BLD-Final | 8/5/2016 | 8/9/2016 | 8/9/2016 5:15:33 PM | P | DEFR |
|
|
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD16-02620
| BLD-Foundation | 8/8/2016 | 8/9/2016 | 8/9/2016 5:14:43 PM | P | PEND |
|
|
Call an hour before // Mark or Jen ###-#### Phone #: ###-####,, needs soils report
|
BLD16-02707
| BLD-Conference | 8/8/2016 | 8/9/2016 | 8/9/2016 2:58:18 PM | P | PASS |
|
|
Please call if you need to meet me onsite with plans. Everything is installed according to plans. Phone #: ###-#### Inspection requested via web by Matthew Dunay,,, done
|
MIS16-00239
| BLD-Conference | 8/5/2016 | 8/9/2016 | 8/9/2016 2:46:24 PM | P | PEND |
|
|
possible interior work being done without a permit,, status review,, no one around,, swo still in place,, no work going on
|
BLD16-01489
| BLD-Footing | 8/9/2016 | 8/9/2016 | 8/9/2016 2:43:39 PM | P | PART |
|
|
1pm pour; Bill Phone #: ###-#### remainder of footings ok
|
BLD15-02014
| BLD-Footing | 8/9/2016 | 8/9/2016 | 8/9/2016 2:18:00 PM | P | PASS |
|
|
Matt Phone #: ###-####,, e-mail recieved ok from architect as built
|
BLD16-01908
| BLD-Conference | 8/8/2016 | 8/9/2016 | 8/9/2016 1:51:27 PM | A | PART |
|
|
would like call ahead; Elliot Phone #: ###-####,, ceiling grid ok,, parcel tag has been removed per office,, need to verify finished product (floor plan) meets plans,, answered ADA ?s
|
BLD16-00935
| BLD-Final | 8/8/2016 | 8/9/2016 | 8/9/2016 12:35:13 PM | A | PASS |
|
|
John Phone #: ###-####
|
BLD16-00935
| DOC - Permit Finaled | 8/9/2016 | 8/9/2016 | 8/9/2016 12:34:33 PM | P | PASS |
|
|
c of o issued
|
BLD15-04508
| BLD-Framing/Rough-in | 8/8/2016 | 8/9/2016 | 8/9/2016 11:55:26 AM | A | PASS |
|
|
Clayton Phone #: ###-####,, ok to insulate
|
BLD16-00893
| BLD-Final | 8/8/2016 | 8/9/2016 | 8/9/2016 11:18:29 AM | A | NR |
|
|
Justin Phone #: ###-####
|
BLD16-02589
| BLD-Footing | 8/8/2016 | 8/9/2016 | 8/9/2016 11:17:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
BLD15-02014
| BLD-Footing | 8/8/2016 | 8/9/2016 | 8/9/2016 11:05:47 AM | A | PEND |
|
|
Matt Phone #: ###-####,, need ok as built or justify,, size of sonotube and rebar specs
|
BLD16-01223
| BLD-Wall Bracing | 8/8/2016 | 8/9/2016 | 8/9/2016 10:43:20 AM | A | NH |
|
|
Charlie Phone #: ###-####
|
BLD16-00686
| BLD-Conference | 8/8/2016 | 8/9/2016 | 8/9/2016 10:41:59 AM | A | NR |
|
|
Setting up in the AM plz call they thought about 10 to 1030 they would be ready for your eyes thanks Phone #: ###-#### Inspection requested via web by Marty Pieroni
|