Inspections for the day of: Tuesday, August 9, 2016.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01345 Aging Inspection8/9/20168/9/20168/11/2016 7:58:10 AM CANC
ESC15-01520 General Inspection8/9/20168/9/20168/10/2016 2:09:20 PM CANC
ESC15-01579 General Inspection8/9/20168/9/20168/10/2016 1:37:06 PM PASS
Foundation footprint is now complete, WIP on first level of parking. No trackout from site, workers parking across street on stabilized areas. MS4 inlets on both sides of entrance on Parkcenter have protection. Silt fence perimeter in good condition. No fugitive dust observed at site, no complaints/issues reported by Greenbelt users.
ESC16-00112 Aging Inspection8/9/20168/9/20168/10/2016 12:53:23 PM PASS
Home complete, landscaped, and cleaned up. Temp BMPs to remain while other homes in East Valley are completed. No corrective actions needed, conditions satisfied.
ESC15-00336 General Inspection8/9/20168/9/20168/9/2016 3:50:06 PM CANC
ESC15-01565 General Inspection8/9/20168/9/20168/9/2016 3:50:01 PM PASS
ESC15-01532 Site Final8/9/20168/9/20168/9/2016 3:49:52 PMPCANC
ESC16-00039 Aging Inspection8/9/20168/9/20168/9/2016 3:49:34 PM PASS
Home complete, landscaped, and all permits finaled. Temp BMPs to remain while SFHs still under construction in Belmar
ESC16-00039 DOC - Permit Finaled8/9/20168/9/20168/9/2016 3:48:56 PMPPASS
ESC15-01519 General Inspection8/9/20168/9/20168/9/2016 12:00:29 PM PASS
Vertical construction in progress. No trackout, no spills or discharges comeing from site. Clean & organized staging area. No corrections, see also ESC15-01184
ESC16-00335 DOC - Permit Finaled8/9/20168/9/20168/9/2016 11:32:21 AMPPASS
Work complete. No sediment or other materials leaving site, site is stabilized. BLD finaled.
ESC16-00448 General Inspection8/9/20168/9/20168/9/2016 11:28:07 AMPPASS
WIP on new fire station. BMPs installed include construction entrance and MS4 inlet protection. No trackout or discharges. Site has constructin fencing and screening. Permit sign is posted. Initial project inspections were conducted on ESC16-00403, which is now finaled. Approved.
ESC15-01361 General Inspection8/9/20168/9/20168/9/2016 11:25:16 AM PASS
No disurbed area, no temp BMPs on or around site. Project has not started, ESC permit issued in November 2015 and is no expired. Will need to re-open when construction resumes.
ESC15-01361 DOC - Permit Finaled8/9/20168/9/20168/9/2016 11:25:04 AMPPASS
ESC16-00403 DOC - Permit Finaled8/9/20168/9/20168/9/2016 11:23:29 AMPPASS
Demo phase complete. New fire station in progress with ESC permit # ESC16-00448. Site is in compliance.
ESC15-01532 General Inspection8/9/20168/9/20168/9/2016 11:19:33 AM CANC
rescheduled for site final walk through
ESC15-01473 Aging Inspection8/9/20168/9/20168/9/2016 10:50:31 AM PASS
ESC15-01628 Aging Inspection8/9/20168/9/20168/9/2016 9:52:42 AM PASS
Home complete, BLD finaled. Final landscaping and stabilization in progress by home owner.
ESC15-00094 General Inspection8/9/20168/9/20168/9/2016 8:31:39 AM PASS
3 active homes in progress at top of Windsong and on Echo culdesace. No subdivision work. No hillside erosion areas of concern and crews are working on storm drain sediment filters and sweeping.
ESC15-01188 General Inspection8/9/20168/9/20168/9/2016 8:30:24 AM PART
Installing interior finishes. Natural vegetation preserved well around clearing limits.

- need to clean up around inlets on Birdsong at Windsong and replace filter mats.

Boulder Heights RP stated they will be sweeping dirt around all inlets in phases 5,6,7 this week and has hired an additional maintenance worker.