MEC17-02985
| Final | 8/8/2017 | 8/9/2017 | 8/9/2017 3:57:22 PM | P | PASS |
|
|
Please inspect after 3 PM. Homeowner Timothy Brunn ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC17-03236
| Final | 8/3/2017 | 8/9/2017 | 8/9/2017 3:36:55 PM | P | PASS |
|
|
Please call Mayra Thometz at ###-#### about 30 - 60 minutes prior to inspection Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC17-03578
| Final | 8/9/2017 | 8/9/2017 | 8/9/2017 3:06:23 PM | P | PASS |
|
|
ready please call Rob ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
|
MEC17-02157
| Final | 8/4/2017 | 8/9/2017 | 8/9/2017 2:37:01 PM | P | FAIL |
|
|
Please call Kelvin James at ###-#### prior to inspection Phone #: ###-#### Inspection requested via web by Mary LaFayette- needs right size breaker installed for A/C
|
MEC17-00552
| Final | 8/8/2017 | 8/9/2017 | 8/9/2017 2:12:01 PM | P | FAIL |
|
|
Please call Paula 30 minutes prior to arrival ###-####. Phone #: ###-#### Inspection requested via web by Andrea Grigsby- flue test required for conditioned space and witnessed- pvc glue and primer need to be of different color than pipe
|
MEC17-03419
| Rough-in | 8/9/2017 | 8/9/2017 | 8/9/2017 1:44:05 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- needs 8" outside air to R/A plenum- sizing of return air 2nd floor doesnt match manual J shows 2 R/A register not one-
|
MEC17-02457
| Rough-in | 8/8/2017 | 8/9/2017 | 8/9/2017 11:23:43 AM | A | PASS |
|
|
Need a cover inspection for Orange Theory in Boise. If you have any questions please call Karl at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- Seal ok- ok to insulate and cover hard lids only
|
MEC17-02346
| Final | 8/7/2017 | 8/9/2017 | 8/9/2017 10:27:53 AM | A | PASS |
|
|
Please call homeowner, Gary McGee at ###-#### about 30 - 60 minutes prior to inspection Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC17-03308
| Rough-in | 8/8/2017 | 8/9/2017 | 8/9/2017 10:01:38 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
MEC17-03308
| Pressure Test | 8/8/2017 | 8/9/2017 | 8/9/2017 10:01:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass
|
MEC17-03255
| Pressure Test | 8/8/2017 | 8/9/2017 | 8/9/2017 9:30:19 AM | A | PASS |
|
|
flue pressure only Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 5lb flue pass
|
MEC17-00017
| Mec-Aging Inspection | 8/9/2017 | 8/9/2017 | 8/9/2017 9:09:51 AM | | PEND |
|
|
contractor will schedule final per phone call
|