PLM17-01845
| Final | 8/9/2017 | 8/9/2017 | 8/9/2017 5:11:07 PM | P | PASS |
|
|
3162 ENTER Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM17-02975
| Water and/or Sewer | 8/9/2017 | 8/9/2017 | 8/9/2017 5:02:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford
|
PLM17-02975
| Final | 8/9/2017 | 8/9/2017 | 8/9/2017 5:01:48 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford
|
PLM17-01148
| Final | 8/9/2017 | 8/9/2017 | 8/9/2017 5:01:02 PM | P | PASS |
|
|
JOB # 50670. Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM17-02882
| Water and/or Sewer | 8/9/2017 | 8/9/2017 | 8/9/2017 4:11:46 PM | A | CANC |
|
|
8am
|
PLM17-02882
| Water and/or Sewer | 8/9/2017 | 8/9/2017 | 8/9/2017 4:10:59 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Adrian Inama. Sewer from the street to the pavement ok to cover.
|
PLM17-02977
| Plumbing Rough-in | 8/9/2017 | 8/9/2017 | 8/9/2017 3:45:59 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bud Lansing
|
PLM17-02935
| Water and/or Sewer | 8/9/2017 | 8/9/2017 | 8/9/2017 3:17:28 PM | P | PART |
|
|
Final sewer connection. Piping ok to cover. Need to finish 24 hour tank test in the am
|
PLM17-02845
| Water Heater Final | 8/9/2017 | 8/9/2017 | 8/9/2017 3:02:28 PM | P | PASS |
|
|
|
PLM17-02614
| Water Heater Final | 8/4/2017 | 8/9/2017 | 8/9/2017 2:15:34 PM | P | PASS |
|
|
Please call Tiffani prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Guzman
|
PLM17-02884
| Water and/or Sewer | 8/9/2017 | 8/9/2017 | 8/9/2017 1:54:40 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Adrian Inama
|
PLM17-02882
| Water and/or Sewer | 8/9/2017 | 8/9/2017 | 8/9/2017 1:54:22 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Adrian Inama
|
PLM17-02968
| Groundwork | 8/8/2017 | 8/9/2017 | 8/9/2017 1:24:18 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. Gw for the Church rr ok to cover ne corner
|
PLM17-02757
| Plumbing Rough-in | 8/8/2017 | 8/9/2017 | 8/9/2017 12:32:10 PM | A | FAIL |
|
|
lock box code 6021 Inspection requested via web by Ryan Baker. Kitchen sink drain is flat. Missing nail plates at the 3" stack base and in the shouwer.
|
PLM17-02935
| Groundwork | 8/8/2017 | 8/9/2017 | 8/9/2017 12:09:03 PM | A | PART |
|
|
Mike Phone #: ###-####. Start 24 hour test on grease interceptor
|
PLM17-02811
| Groundwork | 8/9/2017 | 8/9/2017 | 8/9/2017 11:28:36 AM | A | PASS |
|
|
Call Ryan with any questions. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM17-02407
| Groundwork | 8/8/2017 | 8/9/2017 | 8/9/2017 11:00:39 AM | A | PART |
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. 6" main drain from east to west-out. Branch lines capped.
|
MIS17-00253
| PLM-Conference | 8/8/2017 | 8/9/2017 | 8/9/2017 10:31:41 AM | A | PEND |
|
|
CO inspection - Angel Phone #: ###-####. 1. Pull electrical, mechanical and plumbing permits for new work done. 2. Have the double check valve assembly certified. The dryers are electric. Vents are run into a ventless trap.
|
PLM17-00332
| Final | 8/8/2017 | 8/9/2017 | 8/9/2017 9:34:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
PLM17-02969
| Plumbing Rough-in | 8/8/2017 | 8/9/2017 | 8/9/2017 9:21:51 AM | A | PASS |
|
|
Other contractors/homeowner should be onsite. If not please call me to get access. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|
PLM17-02906
| Final | 8/8/2017 | 8/9/2017 | 8/9/2017 8:45:14 AM | A | FAIL |
|
|
Call homeowner for entry Phone #: ###-#### Inspection requested via web by bob pond. Provide co detectors
|
PLM16-03111
| Final | 8/7/2017 | 8/9/2017 | 8/8/2017 12:57:19 PM | A | PASS |
|
|
Kevin Phone #: ###-####
|