FIR18-00486
| INSP-Sprinkler Rough-in | 8/9/2018 | 8/9/2018 | 8/9/2018 1:14:47 PM | P | PASS |
|
|
Tenting inspectin complete, all plastic sheeting was in place at time of inspection, all overhead fire sprinkler piping approved for cover.
Tenting inspection, call Anthony if there are any concerns. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00273
| INSP-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 1:01:08 PM | A | PASS |
|
|
Notes for as builts are entered under the FIR permit, final inspection complete.
Submitted as built plans to Lee Meredith, plans were approved after Troy left for the day. Scheduled new Inspection per Troy for approval. If there are questions please call Chris @ ###-####697 Phone #: ###-#### Inspection requested via web by Chris Siewert
|
BLD17-04166
| FIRE-Final Inspection | 8/9/2018 | 8/9/2018 | 8/9/2018 12:59:21 PM | P | PASS |
|
|
Previoulsy noted items have been completed, hood is acceptable without fire system based on site survey performed by Fire Experts, the closed type pizza oven does not require a fire system based on his survey. Final life fire safety inspection complete.
Rich Phone #: ###-####
|
BLD18-00392
| FIRE-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 12:40:55 PM | A | PASS |
|
|
Previously noted items have been completed, final life fire safety inspection complete.
Please call ahead for lock code // chris Phone #: ###-####
|
NAF17-00064
| INSP-Final | 8/9/2018 | 8/9/2018 | 8/9/2018 11:39:55 AM | P | DONE |
|
|
Previously noted items have been completed, final life fire safety inspection complete. Gate between school and boys and girls clubs to be getting standard gate hardware per conversation with project superintendent, not an access control gate. If access control is installed on gate then access control will need to be connected to a fire alarm system and release on general fire alarm.
Call prior to going Phone #: 2089602639 >> Inspection requested via mobile web by Kevin hess
|
FIR18-00500
| INSP-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 11:08:57 AM | A | CANC |
|
|
Hood system not interfaced with the fire alarm panel per conversation with point of contact, he requested that the inspection request be cancelled.
Inspection requested via web by Don Kartchner
|
NAF18-00061
| INSP-Sprinkler Rough-in | 8/8/2018 | 8/9/2018 | 8/9/2018 11:06:16 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping inn the commons area soffits complete, approved for cover.
rough in for common areas Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
NAF18-00048
| INSP-Sprinkler Rough-in/Hydro | 8/8/2018 | 8/9/2018 | 8/9/2018 11:05:13 AM | A | DONE |
|
|
Hydrostatic test for unerground supply witnessed, no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
BLD18-01995
| FIRE-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 10:33:34 AM | A | CANC |
|
|
Discussed the issue about the outstanding FIR permit for the address with the point of contact, life fire safety inspection for C of O cannot be completed until outstanding FIR permit issue is resolved, this inspection is cancelled per conversation with point of contact.
Richard Phone #: ###-####
|
FIR18-00433
| INSP-Final Inspection | 8/9/2018 | 8/9/2018 | 8/9/2018 10:18:29 AM | A | CANC |
|
|
Cancelled per conversation with point of contact.
Phone #: ###-#### Inspection requested via web by david davis
|
FIR17-00745
| INSP-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 10:17:57 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR18-00371
| INSP-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 10:17:35 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR18-00368
| INSP-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 10:17:16 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR18-00370
| INSP-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 10:16:39 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR18-00434
| INSP-Final Inspection | 8/9/2018 | 8/9/2018 | 8/9/2018 10:16:13 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR17-00561
| INSP-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 10:15:44 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR18-00119
| INSP-Sprinkler Rough-in | 8/8/2018 | 8/9/2018 | 8/9/2018 8:33:25 AM | A | FAIL |
|
|
Drawings on site are not city approved drawings, could not find the city stap. Head in main entry is blocked, head needs relocated. Add head under mid level stairs. Numerous heads throughout are overspaced, as stated in permit description max spacing is 18ft by 18ft. Re-route piping that is bent around HVAC flex-duct located in basement level.
Contact Brad Westbrook ###-#### 30 min before RTC Start please, if voice mailbox is full please contact Leroy Anderson ###-#### please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
NAF18-00013
| INSP-Final | 8/8/2018 | 8/9/2018 | 8/9/2018 7:31:38 AM | A | DONE |
|
|
Final fire alarm inspection complete.
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
NAF18-00060
| INSP-Final | 8/8/2018 | 8/9/2018 | 8/9/2018 7:30:06 AM | A | PART |
|
|
Final fire alarm inspection complete for activation and visual inspection, as noted in last inspection as builts will be required to be submitted before final can be completed.
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
FIR18-00433
| INSP-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 7:17:39 AM | A | CANC |
|
|
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### >> Inspection requested via web by david davis Inspection cancelled from web by: david davis
|