BLD98-01638
| INSP - Foundation | 9/1/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | | CANC |
|
|
09/01/98 342 - footing cancelled by ron ###-####
|
BLD98-01951
| INSP - Foundation | 9/1/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | | PART |
|
|
/ / 342 -
|
BLD98-01951
| INSP - Framing/Rough-in | 9/1/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | | PART |
|
|
09/01/98 342 - rebar john ###-####
|
BLD98-01970
| INSP - Energy code compliance | 8/31/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | A | CANC |
|
|
09/01/98 342 - done by Tom and c/n left
|
BLD98-01912
| INSP - Framing/Rough-in | 8/26/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | A | PART |
|
|
09/01/98 342 - shr nailing, stud, pt ld transfer, 4 nail straps
|
BLD98-01916
| INSP - Framing/Rough-in | 8/31/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | A | PART |
|
|
09/01/98 342 - nail straps only SHEARWALL sheathing not in place
|
BLD98-02585
| INSP - Foundation | 8/31/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | A | PASS |
|
|
09/01/98 342 - dean ###-#### footing
|
BLD98-01275
| INSP - Framing/Rough-in | 9/1/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | P | FAIL |
|
|
09/01/98 342 - todd ###-#### not nailed off nor built as per engineering
|
BLD98-01865
| INSP - Foundation | 9/1/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | P | CANC |
|
|
09/01/98 342 - JEFF ###-#### cancelled until am
|
BLD98-02044
| INSP - Framing/Rough-in | 9/1/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | P | PART |
|
|
09/01/98 342 - floor nailing, truss bracing being done
|
BLD98-02564
| INSP - Foundation | 9/1/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | P | FAIL |
|
|
09/01/98 342 - ###-#### randy in cameron pk, poured, no one there, no p
|
BLD98-01951
| INSP - Framing/Rough-in | 9/1/1998 | 9/1/1998 | 9/1/1998 12:00:00 AM | P | FAIL |
|
|
09/01/98 342 - landscaping/retaining wall over 4', retaining earth and w slope > than 2:1 needs design engineering
|