Inspections for the day of: Friday, September 1, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01566 BLD-Framing/Rough-in8/31/20009/1/20009/1/2000 12:00:00 AMAPASS
ceiling grid --tim ###-#### grid and wall bracing ok. 9/1/2000 10:01:04 AM
BLD99-02200 BLD-Framing/Rough-in8/31/20009/1/20009/1/2000 12:00:00 AMACANC
don ###-#### fr will resch. for tue . 9/1/2000 11:18:21 AM
BLD99-01722 BLD-Final8/31/20009/1/20009/1/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/31/2000 at 18:20:07. Contact: ###-####. pending p/v perm sign off. 9/1/2000 11:31:36 AM
BLD00-01563 BLD-Concrete8/25/20009/1/20009/1/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/25/2000 at 13:04:54. Contact: ###-####. placed w/special insp. 9/1/2000 3:49:48 PM
BLD00-02016 BLD-Final8/29/20009/1/20009/1/2000 12:00:00 AMPCANC
PEGGY-- ###-#### FN
BLD00-01802 BLD-Final8/31/20009/1/20009/1/2000 12:00:00 AMPPART
Tim Barret- ###-####/need side slope for accessable route to bldg 1:10 front and back/exit sign in a-3 must be located above door in the room missed on approved plan./grab bars and partions beeing instaled need rechecked/need p&z sig 9/1/2000 5:36:36 PM noff/ and public works. 9/1/2000 5:37:02 PM
BLD00-01804 BLD-Final8/31/20009/1/20009/1/2000 12:00:00 AMPPART
Tim Barret- ###-#### need others sign off. 9/1/2000 5:37:44 PM
BLD00-01805 BLD-Final8/31/20009/1/20009/1/2000 12:00:00 AMPPART
Tim Barret- ###-#### need others sign off. 9/1/2000 5:37:31 PM
BLD00-02124 BLD-Final8/31/20009/1/20009/1/2000 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 08/31/2000 at 12:49:35. Contact: ###-####. called and left message on recorder that contractor needs to re call out of time to do insp. 9/1/2000 3:42:27 PM
BLD00-00702 BLD-Final8/31/20009/1/20009/1/2000 12:00:00 AMPNR
###-#### pending others. 9/1/2000 5:28:15 PM
BLD00-01777 BLD-Framing/Rough-in9/1/20009/1/20009/1/2000 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/01/2000 at 11:05:54. Contact: ###-####.
BLD00-01489 BLD-Framing/Rough-in9/1/20009/1/20003/31/2000 12:00:00 AMPFAIL
david-- ###-#### --shaft around grease vent shaft fail c/n posted mech to be reinspected. 9/1/2000 3:25:03 PM