BLD00-01566
| BLD-Framing/Rough-in | 8/31/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | A | PASS |
|
|
ceiling grid --tim ###-#### grid and wall bracing ok. 9/1/2000 10:01:04 AM
|
BLD99-02200
| BLD-Framing/Rough-in | 8/31/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | A | CANC |
|
|
don ###-#### fr will resch. for tue . 9/1/2000 11:18:21 AM
|
BLD99-01722
| BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 18:20:07. Contact: ###-####. pending p/v perm sign off. 9/1/2000 11:31:36 AM
|
BLD00-01563
| BLD-Concrete | 8/25/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 13:04:54. Contact: ###-####. placed w/special insp. 9/1/2000 3:49:48 PM
|
BLD00-02016
| BLD-Final | 8/29/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | P | CANC |
|
|
PEGGY-- ###-#### FN
|
BLD00-01802
| BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | P | PART |
|
|
Tim Barret- ###-####/need side slope for accessable route to bldg 1:10 front and back/exit sign in a-3 must be located above door in the room missed on approved plan./grab bars and partions beeing instaled need rechecked/need p&z sig 9/1/2000 5:36:36 PM noff/ and public works. 9/1/2000 5:37:02 PM
|
BLD00-01804
| BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | P | PART |
|
|
Tim Barret- ###-#### need others sign off. 9/1/2000 5:37:44 PM
|
BLD00-01805
| BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | P | PART |
|
|
Tim Barret- ###-#### need others sign off. 9/1/2000 5:37:31 PM
|
BLD00-02124
| BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 12:49:35. Contact: ###-####. called and left message on recorder that contractor needs to re call out of time to do insp. 9/1/2000 3:42:27 PM
|
BLD00-00702
| BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | P | NR |
|
|
###-#### pending others. 9/1/2000 5:28:15 PM
|
BLD00-01777
| BLD-Framing/Rough-in | 9/1/2000 | 9/1/2000 | 9/1/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 11:05:54. Contact: ###-####.
|
BLD00-01489
| BLD-Framing/Rough-in | 9/1/2000 | 9/1/2000 | 3/31/2000 12:00:00 AM | P | FAIL |
|
|
david-- ###-#### --shaft around grease vent shaft fail c/n posted mech to be reinspected. 9/1/2000 3:25:03 PM
|