Inspections for the day of: Friday, September 1, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorGerry Varner
TitlePLM-INSPECTOR
Phone #447-7209
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-02843 Plumbing Rough-in8/29/20009/1/20009/1/2000 12:00:00 AMAFAIL
PEGGY ###-#### RE-INSP R/I need premise valve and thermal tank 9/5/2000 1:04:46 PM
PLM00-01677 Final8/31/20009/1/20009/1/2000 12:00:00 AMAPASS
GILBERT-- ###-#### FN
PLM00-02263 Plumbing Rough-in8/31/20009/1/20009/1/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/31/2000 at 12:54:00. Contact: ###-####.
PLM00-02257 Final8/31/20009/1/20009/1/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/31/2000 at 14:56:05. Contact: ###-####.
PLM00-03057 Water and/or Sewer9/1/20009/1/20009/1/2000 12:00:00 AMAPASS
jerry this is by blumacs dance (girly) club coming in on vista past vista village, the stinker station and canal, then turn right. He will be ready at 9:00
PLM00-02430 Plumbing Rough-in9/1/20009/1/20009/1/2000 12:00:00 AMPPASS
conference only bldg 3 steve ###-####
PLM00-01719 Final9/1/20009/1/20009/1/2000 12:00:00 AMPFAIL
jim ###-#### check backflow 9/5/2000 1:07:39 PM
PLM00-02750 Plumbing Rough-in9/1/20009/1/20009/1/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/01/2000 at 09:28:47. Contact: ###-####.
PLM00-03122 Water and/or Sewer9/1/20009/1/20009/1/2000 12:00:00 AMPPASS
Galen- ###-####
PLM00-02753 Water and/or Sewer9/1/20009/1/20009/1/2000 12:00:00 AMPPASS
water line inspection ###-####
PLM00-03090 Final8/31/20009/1/20008/31/2000 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/31/2000 at 16:02:53. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/31/2000 at 16:56:47.