Inspections for the day of: Friday, September 1, 2000.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02241 BLD-Foundation8/31/20009/1/20009/1/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/31/2000 at 18:09:27. Contact: ###-####. Setting foarms at this time appears will be ok. 9/1/2000 10:50:29 AM
BLD00-02070 BLD-Foundation8/31/20009/1/20009/1/2000 12:00:00 AMAPASS
BRENT ###-####
BLD00-01402 BLD-Energy code compliance8/31/20009/1/20009/1/2000 12:00:00 AMAPASS
RICK --###-#### ENERGY CODE
MEC00-02879 Rough-in8/31/20009/1/20009/1/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/31/2000 at 14:23:03. Contact: ###-####.
BLD00-02457 BLD-Foundation8/31/20009/1/20009/1/2000 12:00:00 AMAPART
DANE-- ###-#### FOUND WALL appears ok. 9/1/2000 10:49:47 AM
BLD00-00306 BLD-Final8/31/20009/1/20009/1/2000 12:00:00 AMAFAIL
dwayne ###-#### Grade away 2% required away from foundation. Crawl vapor coverage.a9/1/2000 11:26:01 AM 9/1/2000 11:26:26 AM
BLD00-01548 BLD-Wall cover9/1/20009/1/20009/1/2000 12:00:00 AMAFAIL
Added by Inspector: 407 On 9/1/2000 No stamped approved plans on site 2nd notice left on site, i was called via cell and was left a message to re-inspect,left 2nd correction to provide approved plans and recall for insp.
BLD00-01943 BLD-Framing/Rough-in8/31/20009/1/20009/1/2000 12:00:00 AMPPART
Jon ###-####
BLD00-01442 BLD-Final8/31/20009/1/20009/1/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/31/2000 at 18:06:16. Contact: ###-####.
BLD00-01852 BLD-Framing/Rough-in9/1/20009/1/20009/1/2000 12:00:00 AMPFAIL
jay ###-####
MEC00-02955 Rough-in9/1/20009/1/20009/1/2000 12:00:00 AMPPASS
russ-- ###-#### r/i
MEC00-02942 Pressure Test9/1/20009/1/20009/1/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/01/2000 at 08:23:46. Contact: ###-####.
BLD00-00969 BLD-Wall cover9/1/20009/1/20009/1/2000 12:00:00 AMPPASS
Added by Inspector: 407 On 9/1/2000 ok to cover.
BLD00-01918 BLD-Framing/Rough-in9/1/20009/1/20009/1/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/01/2000 at 08:55:27. Contact: ###-####. Re-insp still missing mst floor to floor 9/5/2000 9:09:22 AM
BLD00-01482 BLD-Framing/Rough-in9/1/20009/1/20009/1/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 09/01/2000 at 09:42:33. Contact: ###-####.needs mec 9/5/2000 9:08:30 AM
MEC00-01693 Final9/1/20009/1/20009/1/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/01/2000 at 10:32:44. Contact: ###-####.insulate boots 9/5/2000 9:07:59 AM
BLD00-01601 BLD-Final9/1/20009/1/20009/1/2000 12:00:00 AMPFAIL
TOM -- ###-#### FN