Inspections for the day of: Friday, September 1, 2000.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR00-00275 INSP-Sprinkler Rough-in8/31/20009/1/20009/1/2000 12:00:00 AMAPASS
underground test insp De Best Fire Protection ###-#### undergound hydro okay. plans not on site - Debest will ensure they are on-site for any future inspections 9/1/2000 9:14:45 AM
BLD00-01255 FIRE-Conference8/31/20009/1/20009/1/2000 12:00:00 AMAPART
LARRY SMITH-- CELL ###-#### FOR CONF discussed duct detector placement; fire extinguisher placement; alarm system 9/1/2000 10:40:18 AM
BLD00-00976 FIRE-Final Inspection8/31/20009/1/20009/1/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/31/2000 at 14:24:53. Contact: ###-####. 9/1/2000 8:43:00 AM
BLD00-00899 FIRE-Final Inspection8/31/20009/1/20009/1/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/31/2000 at 15:20:01. Contact: ###-####. sprinklers overspaced in chart storage room 9/1/2000 10:39:17 AM
FIR00-00432 INSP-Final Inspection9/1/20009/1/20009/1/2000 12:00:00 AMAPASS
Scheduled by Inspector: 409 On 9/1/2000
BLD98-03661 FIRE-Conference9/1/20009/1/20009/1/2000 12:00:00 AMPPART
###-#### Jim checked life safety for the new pool area; exits and alarms okay. gave approval to use the pool effective 9/5/00 9/1/2000 2:41:49 PM
BLD00-00899 FIRE-Final Inspection9/1/20009/1/20009/1/2000 12:00:00 AMPPASS
Scheduled by Inspector: 409 On 9/1/2000
BLD00-02200 FIRE-Final Inspection8/31/20009/1/20009/1/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/31/2000 at 16:01:47. Contact: ###-####.
BLD00-02016 FIRE-Final Inspection8/30/20009/1/20009/1/2000 12:00:00 AMPPASS
###-#### fire not on card for sign-off 9/1/2000 12:05:13 PM
BLD99-03287 FIRE-Final Inspection8/31/20009/1/20009/1/2000 12:00:00 AMPPASS
skip ###-#### fire fn signed for structural inspector also per Perry 9/1/2000 2:05:01 PM
FIR00-00505 INSP-Supply line flush8/31/20009/1/20009/1/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/31/2000 at 13:43:40. Contact: ###-####. not ready - talked to the general contractor and they will reschedule for next week 9/1/2000 12:25:14 PM
BLD00-00702 FIRE-Final Inspection8/31/20009/1/20009/1/2000 12:00:00 AMPFAIL
###-#### c/n issued - test hood system; balance report; K extinguisher 9/1/2000 4:44:09 PM
BLD00-01802 FIRE-Final Inspection8/31/20009/1/20009/1/2000 12:00:00 AMPPASS
Tim Barret- ###-####
BLD00-01804 FIRE-Final Inspection8/31/20009/1/20009/1/2000 12:00:00 AMPPASS
Tim Barret- ###-####
BLD00-01805 FIRE-Final Inspection8/31/20009/1/20009/1/2000 12:00:00 AMPPASS