Inspections for the day of: Wednesday, September 1, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-00547 BLD-Aging Inspection9/1/20049/1/20049/1/2004 12:00:00 AM NR
WIP. 9/1/2004 4:39:24 PM
MIS03-00127 MIS-Aging Inspection9/1/20049/1/20049/1/2004 12:00:00 AM DONE
Exp. 9/1/2004 4:37:57 PM
BLD04-00882 BLD-Aging Inspection9/1/20049/1/20049/1/2004 12:00:00 AM NR
WIP 9/1/2004 4:41:21 PM
BLD04-01066 BLD-Aging Inspection9/1/20049/1/20049/1/2004 12:00:00 AM NR
WIP 9/1/2004 4:40:23 PM
BLD04-01904 BLD-Framing/Rough-in8/31/20049/1/20049/1/2004 12:00:00 AMAPASS
odie; Phone #: ###-#### Internet Inspection Request from: Annette Moore Note: Architect to verify exit lights at New wall (that basically divides bldg in 1/2f) Required? Odie checking this out. 9/1/2004 11:48:22 AM 9/1/2004 11:49:12 AM
BLD04-01956 BLD-Final8/31/20049/1/20049/1/2004 12:00:00 AMAPASS
###-#### dee dee
BLD04-00955 BLD-Footing8/31/20049/1/20049/1/2004 12:00:00 AMPPASS
manual; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD04-01216 BLD-Footing8/31/20049/1/20049/1/2004 12:00:00 AMPPASS
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Footing and stem wall OK.... Contr to install 3" insulation prior to slab. He has on site. 9/1/2004 12:36:50 PM
BLD04-01478 BLD-Energy code compliance9/1/20049/1/20049/1/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 9/1/2004 at 6:55:47 AM.
MEC04-02334 Pressure Test9/1/20049/1/20049/1/2004 12:00:00 AMPPASS
###-#### john
BLD04-00500 BLD-Final9/1/20049/1/20049/1/2004 12:00:00 AMPPASS
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/C issued. 9/1/2004 4:27:57 PM
BLD04-01381 BLD-Framing/Rough-in8/30/20049/1/20049/1/2004 12:00:00 AMPFAIL
todd ###-#### C/N 9/1/2004 12:21:32 PM