PLM04-01752
| Final | 8/31/2004 | 9/1/2004 | 9/1/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/31/2004 at 11:42:37 AM. Contact: ###-####. need to finish piping pan drain to outside building called contractor will recall when ready 9/1/2004 11:11:04 AM
|
PLM04-02469
| Water and/or Sewer | 8/31/2004 | 9/1/2004 | 9/1/2004 12:00:00 AM | A | PASS |
|
|
mike ###-#### sewer line to bulding #9 and sewer to future building #11 test ok 9/1/2004 9:26:51 AM
|
PLM04-01064
| Water and/or Sewer | 9/1/2004 | 9/1/2004 | 9/1/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 9/1/2004 at 9:45:18 AM. Contact: ###-####. copper water supply stub from outside building to inside test ok ok to cover 9/1/2004 3:12:14 PM
|