PLM06-02990
| Final | 9/1/2006 | 9/1/2006 | 9/1/2006 4:06:41 PM | P | FAIL |
|
|
Jason; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt this is for a gas water heater replacement need need to use approved material fo T&P drain line need t add some additional screws to flue piping and fitting,s contractor to recall when ready
|
PLM06-01617
| Final | 9/1/2006 | 9/1/2006 | 9/1/2006 3:11:27 PM | P | PASS |
|
|
Please call for access. ###-####; Phone #: ###-#### Internet Inspection Request from: Jeff Miranda
|
PLM05-03314
| Final | 9/1/2006 | 9/1/2006 | 9/1/2006 2:51:37 PM | P | PART |
|
|
Please call Donny with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel received system verification for med gas
|
PLM06-02876
| Sprinkler (Final) | 9/1/2006 | 9/1/2006 | 9/1/2006 1:25:49 PM | P | PASS |
|
|
clyde; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM06-02446
| Plumbing Rough-in | 9/1/2006 | 9/1/2006 | 9/1/2006 12:11:23 PM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Cameron Smith need to move water lines and drain line out to front of 2x6 wall at washer box and off set p-trap to front of wall
|
PLM06-01856
| Water and/or Sewer | 8/31/2006 | 9/1/2006 | 9/1/2006 11:37:40 AM | A | PART |
|
|
troy - partial; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley need to lower water line up by building for 36 inches of cover need to correct reverse grade in pipe at coupling down stream of second 45 called contractor will recall when ready
|
PLM06-02972
| Sprinkler (Final) | 8/31/2006 | 9/1/2006 | 9/1/2006 11:13:25 AM | A | PASS |
|
|
daniel - late morning if possible; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM06-01772
| Final | 9/1/2006 | 9/1/2006 | 9/1/2006 10:55:42 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/1/2006 at 6:40:39 AM. Contact: ###-####.
|
PLM06-02019
| Final | 8/31/2006 | 9/1/2006 | 9/1/2006 10:34:04 AM | A | PART |
|
|
call Doran please before leaving; Phone #: ###-#### Internet Inspection Request from: joe paige need 120 degree hot water limitation to laves called contractor
|
PLM06-02974
| Water and/or Sewer | 8/31/2006 | 9/1/2006 | 9/1/2006 10:19:35 AM | A | PART |
|
|
BEN; Phone #: ###-#### Internet Inspection Request from: Darla Downs out side water line test ok ok to cover need to have premius protection backflow device tested and certified contractor to recall when ready
|
PLM06-02979
| Sprinkler (Final) | 8/31/2006 | 9/1/2006 | 9/1/2006 9:36:44 AM | A | PASS |
|
|
harmony; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM06-02939
| Plumbing Rough-in | 8/31/2006 | 9/1/2006 | 9/1/2006 9:25:25 AM | A | NR |
|
|
Call Doran please; Phone #: ###-#### Internet Inspection Request from: joe paige
|
PLM06-02977
| Water and/or Sewer | 8/31/2006 | 9/1/2006 | 9/1/2006 9:22:27 AM | A | PASS |
|
|
eddie; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM06-02977
| DOC - Permit Finaled | 9/1/2006 | 9/1/2006 | 9/1/2006 9:22:14 AM | A | PASS |
|
|
eddie; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM06-02865
| Plumbing Rough-in | 9/1/2006 | 9/1/2006 | 9/1/2006 8:42:38 AM | A | PASS |
|
|
|