Inspections for the day of: Friday, September 1, 2006.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00751 FIR-Aging Inspection9/1/20069/1/20069/5/2006 2:45:10 PM DONE
wip
FIR06-00572 INSP-Alarm Testing9/1/20069/1/20069/5/2006 11:53:05 AMPCANC
Scheduled by a contractor via Hello! on 9/1/2006 at 10:34:28 AM. Contact: ###-####. To be rescheduled per conversation with contractor.
BLD05-02379 FIRE-Alarm Testing8/31/20069/1/20069/1/2006 3:46:17 PMPCANC
Wrong permit number called in for inspection, was intended for an alarm test-to be rescheduled.
BLD05-03448 FIRE-Final Inspection8/31/20069/1/20069/1/2006 3:44:46 PMAPART
Inspection for the remodeled restrooms and one adjacent confrence room is satisfactory, final pending project related fire sprinkler permit final.
FIR05-00270 INSP-Sprinkler Rough-in9/1/20069/1/20069/1/2006 3:11:18 PMPPART
UG fire service supply line is good for cover.
BLD06-01771 FIRE-Final Inspection9/1/20069/1/20069/1/2006 2:40:44 PMPPASS
Required corrections have been verified for completion, inspection passed.
FIR06-00537 INSP-Final Inspection9/1/20069/1/20069/1/2006 2:27:17 PMAPART
Final pending completion of elevator controls and duct detectors for HVAC unit shutdown, required corrections from previous inspection have been completed.
BLD06-00879 BLD-Other8/31/20069/1/20069/1/2006 2:24:07 PMAFAIL
Need to provide approved exiting hardware at two exterior doors from the common corridor on the first floor, restrooms on the 2nd floor and basement level are not completed as indicated on work scope, the elevator is not installed at this time, project related fire alarm permit must be finaled prior to BLD permit final approval pending completion of duct detection and elevator controls.
BLD06-01398 BLD-Other8/31/20069/1/20069/1/2006 2:18:58 PMAPART
Missing doors and hardware at three locations, final pending shell and project related fire alarm permit finals.
BLD06-01128 BLD-Other8/31/20069/1/20069/1/2006 2:17:07 PMAPART
Final pending shell and project related fire alarm permit finals.
BLD06-01127 BLD-Other8/31/20069/1/20069/1/2006 2:16:08 PMAPART
Need to repair one emergency light at the main entrance, final pending shell and project related fire alarm permit finals.
FIR05-00644 INSP-Sprinkler Rough-in8/31/20069/1/20069/1/2006 1:12:08 PMAPART
OH rough-in for the drop ceiling area above the pool as marked on approved plans is acceptable for cover.
FIR06-00137 INSP-Supply line flush8/31/20069/1/20069/1/2006 12:49:38 PMAFAIL
Partial underground, thrust blocks later Internet Inspection Request from: John Warnick NOTE: 4" pipe is installed and 6" fire service pipe is indicated on permit scope, tracer wire is not provided, the pipe installation does not meet min. depth of bury, approved plans not available on site for review, as noted by contractor thrust blocks are not completed at this time.
BLD05-02089 FIRE-Final Inspection9/1/20069/1/20069/1/2006 12:27:57 PMPPART
Final pending provision for correct sprinkler coverage at the level of exit discharge at two stairways.
FIR05-00795 INSP-Final Inspection9/1/20069/1/20069/1/2006 12:24:54 PMPPASS
UG fire supply line permit finaled.
FIR06-00328 INSP-Final Inspection8/30/20069/1/20069/1/2006 11:12:43 AMAPART
Final field inspection is satisfactory pending proper coverage at the level of exit discharge for two stairways.
BLD06-02309 FIRE-Final Inspection8/31/20069/1/20069/1/2006 11:08:17 AMAPASS
Life safety inspection passed for the racking portion of this permit.
FIR06-00176 INSP-Final Inspection8/30/20069/1/20069/1/2006 11:03:17 AMAPASS
Fire alarm passed field inspection, permit finaled.