ESC06-00964
| Tracking Control | 8/28/2006 | 9/1/2006 | 9/5/2006 8:01:59 AM | P | CANC |
|
|
Re-scheduled inspection until Friday afternoon, 9/8/06.
|
ESC05-01884
| Random Inspection | 9/1/2006 | 9/1/2006 | 9/5/2006 7:57:41 AM | P | PART |
|
|
|
ESC06-00684
| BMP Violation | 8/28/2006 | 9/1/2006 | 9/1/2006 2:55:14 PM | P | PASS |
|
|
Remove drop Inlet protection.
|
ESC04-00912
| Random Inspection | 9/1/2006 | 9/1/2006 | 9/1/2006 2:29:44 PM | P | PART |
|
|
Verbal to rp, sales trailer on bare ground, no rock entrance or other hard surface. Bare ground has not been stablized. Need to provide rock entrance and parking area at trailer. Stalization of bare lots including building lots??? Status?
|
ESC05-02036
| BMP Violation | 8/28/2006 | 9/1/2006 | 9/1/2006 2:28:00 PM | P | PART |
|
|
Follow up
|
ESC06-00989
| Site Preparation | 9/1/2006 | 9/1/2006 | 9/1/2006 2:26:01 PM | P | FAIL |
|
|
Correction notice to rp, ESC provisions not installed including construction entrance, sediment barriers on downhill side & ashalt has trackout. Complete installation of plan and permit conditions by the end of the day of Tuesday, Sept. 5 or a stop work order may be issued. Will re-inspect on Wednesday Sept 6. ###-####
|