Inspections for the day of: Friday, September 1, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-01256 Complaint Inspection8/30/20069/1/20069/5/2006 7:51:23 AMACANC
ESC06-00087 Site Preparation8/30/20069/1/20069/5/2006 7:50:56 AMACANC
ESC06-00281 Site Preparation8/30/20069/1/20069/5/2006 7:50:44 AMACANC
ESC05-01662 Site Preparation8/30/20069/1/20069/5/2006 7:50:21 AMACANC
ESC05-01913 Site Preparation8/30/20069/1/20069/5/2006 7:50:08 AMACANC
ESC06-00035 Site Preparation8/30/20069/1/20069/1/2006 11:55:22 AMAPASS
Site looks okay.
ESC06-00276 Site Preparation8/30/20069/1/20069/1/2006 11:44:09 AMAPART
Construction is underway and bmp's are in place, contacted RP about posting ESC sign.
ESC06-00157 Site Preparation8/30/20069/1/20069/1/2006 9:17:22 AMAFAIL
verbal c/n to RP. ESC sign needs to be reposted, access control fence needs repaired and some minimal trackout on discovery needs to be addressed and maintained.
ESC05-01261 Site Final9/1/20069/1/20069/1/2006 9:16:29 AMPPASS
ESC05-01621 Site Final9/1/20069/1/20069/1/2006 9:16:20 AMPPASS
ESC04-00532 Site Final9/1/20069/1/20069/1/2006 9:16:11 AMPPASS
ESC04-01341 Site Final9/1/20069/1/20069/1/2006 9:12:28 AMPPASS
ESC03-00270 Site Final9/1/20069/1/20069/1/2006 9:12:20 AMPPASS
ESC05-01349 Site Final9/1/20069/1/20069/1/2006 9:10:52 AMPPASS
Final stabilization has been completed.
ESC05-01003 Site Final9/1/20069/1/20069/1/2006 9:10:37 AMPPASS
Final stabilization has been completed.
ESC06-00285 Site Preparation8/30/20069/1/20069/1/2006 8:51:13 AMAPART
Construction is underway and all bmp's are in place. Contacted RP about some minimal repairs needed on the silt fence along the south side the property near the canal. Sign is posted and construction entrance is clearly marked.